Several landowners appealed the Engineer's Report for the Rose Beach Line Drain Outlet Structure under sections 48 and 54 of the Drainage Act.
The report recommended constructing a steel sheet piling flume to address severe erosion at the drain's outlet on Lake Erie.
The appellants argued the project was too costly, unnecessary, and poorly designed for a coastal environment.
The Tribunal dismissed the section 48 appeals, finding the appellants failed to provide expert engineering evidence to contradict the municipality's engineer.
However, the Tribunal ordered the municipality to obtain a coastal engineer's review of the design and to secure all necessary agency approvals before proceeding.
The Tribunal also ordered that the existing right of way be used for access and approved minor revisions to the assessment schedules.