The appellant appealed the engineer's report and the decision of the Court of Revision regarding the Hope Drain under the Drainage Act.
The appellant sought modifications to the drainage works, including retaining a catchbasin, installing a larger tile, and allowing a proposed grassed waterway to be cropped.
The Tribunal ordered the report amended to retain the catchbasin and install the larger tile at the appellant's expense, as agreed or requested.
However, the Tribunal dismissed the request to crop the waterway, finding that a permanently grassed waterway was necessary to control erosion.
The appeal regarding the assessments was dismissed, subject to adjustments for the ordered modifications.