The appellant appealed the engineer's report and the decision of the Court of Revision regarding the repair and improvement of the Brown/Reid Drainage Works.
The appellant argued that the costs outweighed the benefits, alternative designs were not considered, and his property was unfairly assessed.
The Tribunal dismissed the appeal regarding the design and cost-benefit, finding the proposed works practical and cost-beneficial.
However, the Tribunal varied the assessment, reducing the appellant's benefit assessment and increasing the assessment of an upstream landowner who benefited more from the improved outlet.
The Tribunal also ordered the inclusion of fish refuge areas as recommended by the engineer.