The plaintiff subcontractor, S&K Construction, registered a construction lien against the owner, NAMF, and the general contractor, Hussain, for unpaid work on a gym renovation project.
The central dispute involved the installation of a defective epoxy gym floor.
The court found that both the general contractor and the subcontractor breached their respective contracts by failing to deliver a floor that was smooth enough for gym use.
As a result, the subcontractor's lien claim for the floor work was dismissed.
The owner's claim for the full cost of a replacement pulastic floor was denied due to betterment, but the owner was awarded the cost of removing the defective epoxy.
The subcontractor was awarded a reduced lien amount for authorized non-floor work, and the general contractor was awarded payment for an HVAC unit.