Three landowners appealed the engineer's report for the Mindemoya Drain and Yonge Street Reconstruction project under the Drainage Act.
One appellant withdrew due to health reasons.
The remaining two appellants challenged the adequacy of allowances for loss of access, the location of maintenance easements, and the handling of excavated soil and trees on their properties.
The Tribunal ordered amendments to the report, including relocating a maintenance easement, increasing allowances for loss of access and tree removal, requiring specific soil handling procedures, and protecting sinkholes as part of the drainage works.
The Tribunal also ordered the removal of certain watershed areas from the assessment schedule.