The appellant appealed an engineer's report regarding the Darmar-Tamlin Municipal Drain under the Drainage Act.
At the start of the hearing, both parties noted that the adopted report was missing several mandatory elements, including a watershed map, stamped drawings, cost estimates, and a maintenance schedule.
The Tribunal found that these omissions constituted a significant error that failed to comply with section 8 of the Act.
Relying on its broad powers under section 51(1), the Tribunal issued an interim order adjourning the hearing and referring the report back to the engineer with specific directions to revise it to include the omitted items.
The Tribunal also extended the appellant's time to appeal under sections 48 and 54 to cure any process defects.