Engineer and firm found guilty of professional misconduct for design failures on Nipigon River Bridge.
The Association of Professional Engineers of Ontario brought disciplinary proceedings against a professional engineer and an engineering firm regarding the failed design of a critical structural component of the Nipigon River Bridge.
The respondents admitted to professional misconduct, acknowledging they failed to verify critical design assumptions and provided inadequate oversight of a junior engineer.
The Discipline Committee accepted a joint submission on penalty, ordering a four-week licence suspension for the engineer, a requirement for the firm to implement a Quality Assurance Plan, and $200,000 in costs.