Several ratepayers appealed the engineer's report on the Bearss Drain and Wm.
Michael Drain under sections 48 and 54 of the Drainage Act.
The appellants challenged the assessment of costs, the proposed berms, and the allowances.
The Tribunal found that the proposed flood control project was appropriate to address water flowing up the drains from Lake Erie.
The Tribunal dismissed the appeals regarding the modification of the works and the allowances, but ordered adjustments to the assessments to ensure that abutting lots capable of supporting only one residence were assessed as single buildable parcels.