Several landowners appealed the Engineer's Report for the Filsinger Municipal Drain under sections 48 and 54 of the Drainage Act.
The appellants challenged the inclusion of certain lands in the watershed, the scope and cost of the proposed drainage work, the right-of-way allowances, and the assessment calculations.
The Tribunal dismissed the section 48 appeals regarding the watershed and drainage work, finding the existing drain was in poor condition and the proposed improvements were necessary.
The Tribunal allowed one appellant's appeal in part, increasing his right-of-way allowance based on a higher land value.
The Tribunal also allowed the section 54 appeals in part, adjusting the maintenance assessments for the upstream reach of the closed drain, but otherwise upheld the engineer's assessment calculations.