Several landowners appealed the engineer's report and the Court of Revision's decision regarding the Story Drain project under the Drainage Act.
The project involved incorporating an existing private drain enclosure into the municipal drain and replacing a failed section.
The appellants challenged the inclusion of prior engineering costs, the adequacy of allowances for right-of-way and existing drains, the assessment ratios, and the location of the outlet.
The Tribunal ordered a nominal allowance for the existing drain, adjusted the Benefit/Outlet assessment ratios to 60/40, removed a portion of the prior engineering costs, and confirmed the existing outlet location.
Requests for costs were denied.