This drainage appeal concerned a proposed municipal drain improvement intended to reduce recurring flooding on agricultural land within a multi-municipality watershed.
After hearing evidence, the tribunal concluded the engineer's proposed works were no longer viable and abandoned the project, finding the limited relief did not justify the expense and that the fragmented statutory structure had contributed to the failure.
The tribunal emphasized the need for cooperative, system-wide administration of large intermunicipal drainage works and suggested that other legislative mechanisms, including joint municipal administration, may be more suitable.
All appeals were dismissed because no project remained to be implemented, and costs were apportioned among the downstream municipality, the engineering firm, and assessed landowners, with separate municipal and party-specific hearing costs.