Appellants appealed a drainage report for the Point Abino Municipal Drain.
The Tribunal found that the Haggerty Drain should be included as a branch drain to improve agricultural drainage.
The Tribunal upheld James Markland's assessment as fair and equitable.
To address concerns about flooding and the ecological balance of a conservation area, the Tribunal ordered the report referred back to the Drainage Engineer to extend the works to the Lake Erie outlet and install a limited lift pumping station to relieve peak flooding without adverse environmental impact.