1 total
Appeal of consent for lot creation dismissed; proposed residential lots met industrial setback requirements.
The appellant appealed a Committee of Adjustment decision granting consent for the creation of two residential lots, arguing that the proposed lots did not meet the required setback from his adjacent industrial property.
The Tribunal found that the proposed consent conformed with the Provincial Policy Statement, the Growth Plan, and the applicable official plans.
The Tribunal also determined that there was sufficient space within the proposed parcels to maintain the required 70-metre setback from the industrial use.
The appeal was dismissed and provisional consent was granted subject to conditions.