Appeal of municipal drain engineer's report dismissed; proposed erosion control design confirmed.
The appellants appealed the engineer's report for a municipal drain project designed to convey stormwater and control erosion in a steep gully area.
The appellants argued the project was excessive and unwarranted, suggesting less expensive alternatives like rock riprap.
The Tribunal accepted the uncontradicted evidence of the engineer that the design was appropriate for the extreme gradient and high water velocities, and that the appellants' property was properly assessed.
The appeal was denied and the engineer's report was confirmed without modification.
MacKenzie Camp Road Municipal Drain (RE), 2013 ONAFRAAT 1