Ottawa Committee of Adjustment
Panel: 2 - Suburban
File: D08-01-26/B-00033
Application: Consent under section 53 of the Planning Act
Applicant: 16143776 Canada Inc.
Property Address: 878 Ivanhoe Avenue
Ward: 7 - Bay
Legal Description: Part of Lot 138, Registered Plan 311
Zoning: R2G [1564]
Zoning By-law: 2008-250
Heard: March 17, 2026, in person and by videoconference
APPLICANT’S PROPOSAL AND PURPOSE OF THE APPLICATION
1The Applicant wants to subdivide their property into two parcels of land. It is proposed to convert the existing dwelling to a semi-detached dwelling. The vacant parcel will be for future residential development.
CONSENT REQUIRED
2The Applicant seeks the Committee’s consent to sever land. The property is shown as Parts 1 & 2 on a draft 4R-plan filed with the application and the separate parcels will be as follows:
Table 1 Proposed Parcels
| File No. | Frontage | Depth | Area | Part No. | Building |
|---|---|---|---|---|---|
| B-0033 | 11.61 metres | 30.48 metres | 354.50 sq. metres | 1 | Vacant Land |
| Retained | 18.86 metres | 30.49 metres | 573.90 sq. metres | 2 | Existing detached dwelling to be converted to a semi-detached dwelling |
3The property is not the subject of any other current application under the Planning Act.
4For the purposes of the transition and continuation provisions of Zoning By-law 2026-50, this application was deemed to be complete on February 15, 2026.
PUBLIC HEARING
Oral Submissions Summary
5Chris Jalkotzy, agent for the Applicant, provided a slide presentation, a copy of which is on file with the Secretary-Treasurer and available from the Committee Coordinator upon request.
6Mr. Jalkotzy highlighted that two parking spaces were proposed for the semi-detached dwelling, and options were being considered in the design of the new building to accommodate an additional two parking spaces. He also noted that parking was not required according to the Zoning By-law.
7City Planner Wendy Yang confirmed she had no concerns with the application.
8Following the public hearing, the Committee reserved its decision.
DECISION AND REASONS OF THE COMMITTEE: APPLICATION GRANTED
Application Must Satisfy Statutory Tests
9Under the Planning Act, the Committee has the power to grant a consent if it is satisfied that a plan of subdivision of the land is not necessary for the proper and orderly development of the municipality. Also, the Committee must be satisfied that an application is consistent with the Provincial Planning Statement, 2024, and has regard for matters of provincial interest under section 2 of the Act, as well as the following criteria set out in subsection 51(24):
Criteria
(24) In considering a draft plan of subdivision, regard shall be had, among other matters, to the health, safety, convenience, accessibility for persons with disabilities and welfare of the present and future inhabitants of the municipality and to,
a) the effect of development of the proposed subdivision on matters of provincial interest as referred to in section 2;
b) whether the proposed subdivision is premature or in the public interest;
c) whether the plan conforms to the official plan and adjacent plans of subdivision, if any;
d) the suitability of the land for the purposes for which it is to be subdivided;
d.1) if any affordable housing units are being proposed, the suitability of the proposed units for affordable housing;
e) the number, width, location and proposed grades and elevations of highways, and the adequacy of them, and the highways linking the highways in the proposed subdivision with the established highway system in the vicinity and the adequacy of them;
f) the dimensions and shapes of the proposed lots;
g) the restrictions or proposed restrictions, if any, on the land proposed to be subdivided or the buildings and structures proposed to be erected on it and the restrictions, if any, on adjoining land;
h) conservation of natural resources and flood control;
i) the adequacy of utilities and municipal services;
j) the adequacy of school sites;
k) the area of land, if any, within the proposed subdivision that, exclusive of highways, is to be conveyed or dedicated for public purposes;
l) the extent to which the plan’s design optimizes the available supply, means of supplying, efficient use and conservation of energy; and
m) the interrelationship between the design of the proposed plan of subdivision and site plan control matters relating to any development on the land, if the land is also located within a site plan control area designated under subsection 41 (2) of this Act or subsection 114 (2) of the City of Toronto Act, 2006. 1994, c. 23, s. 30; 2001, c. 32, s. 31 (2); 2006, c. 23, s. 22 (3, 4); 2016, c. 25, Sched. 4, s. 8 (2).
Evidence
10Evidence considered by the Committee included all oral submissions made at the hearing, as highlighted above, and the following written submissions held on file with the Secretary-Treasurer and available from the Committee Coordinator upon request:
Application and supporting documents, including a cover letter, plans, parcel abstract, tree information, photo of the posted sign, and a sign posting declaration.
City Planning Report received March 12, 2026, with no concerns.
Rideau Valley Conservation Authority email dated March 11, 2026, with no objections.
Hydro Ottawa email dated March 10, 2026, with comments.
M. Smith, resident, email dated March 6, 2026, with comments.
A. Roscoe, resident, email dated March 10, 2026, with comments.
Effect of Submissions on Decision
11The Committee considered all written and oral submissions relating to the application in making its decision and granted the application.
12The Committee notes that the City’s Planning Report raises “no concerns” regarding the application, subject to the requested conditions agreed to by the Applicant’s agent.
13Based on the evidence, the Committee is satisfied that the proposal is consistent with the Provincial Planning Statement, 2024, that promotes building homes, sustaining strong communities; providing infrastructure and public service facilities in an efficient manner while accommodating projected needs; the wise use and management of resources; and, protecting public health and safety.
14The Committee is also satisfied that the proposal has adequate regard to matters of provincial interest, including the orderly development of safe and healthy communities; the appropriate location of growth and development; and the protection of public health and safety.
15Additionally, the Committee is satisfied that a plan of subdivision of the land is not necessary for the proper and orderly development of the municipality.
16Moreover, the Committee is satisfied that the proposal has adequate regard for the criteria specified under subsection 51(24) of the Planning Act and is in the public interest.
17THE COMMITTEE OF ADJUSTMENT ORDERS that the application is granted and the provisional consent is to be given, subject to the conditions set out in Appendix A to this decision.
"Fabian Poulin" FABIAN POULIN VICE-CHAIR
“Jay Baltz” JAY BALTZ MEMBER
"George Barrett" GEORGE BARRETT MEMBER
"Heather MacLean" HEATHER MACLEAN MEMBER
"Julianne Wright" JULIANNE WRIGHT MEMBER
I certify this is a true copy of the decision of the Ottawa Committee of Adjustment, dated March 27, 2026.
“Michel Bellemare” MICHEL BELLEMARE SECRETARY-TREASURER
NOTICE OF RIGHT TO APPEAL
To appeal this decision to the Ontario Land Tribunal (OLT), a completed appeal form and the filing fee must be submitted via one of the below options and must be received no later than 3:00 p.m. on April 16, 2026.
OLT E-FILE SERVICE – An appeal can be filed online through the E-File Portal . First-time users will need to register for a My Ontario Account. Select [Ottawa (City): Committee of Adjustment] as the Approval Authority. To complete the appeal, fill in all the required fields and provide the filing fee by credit card.
BY EMAIL - Appeal packages can be submitted by email to cofa@ottawa.ca. The appeal form is available on the OLT website at Forms | Ontario Land Tribunal. Please indicate on the appeal form that payment will be made by credit card.
IN PERSON – Appeal packages can be delivered to the Secretary-Treasurer, Committee of Adjustment, 101 Centrepointe Drive, 4th floor, Ottawa, Ontario, K2G 5K7. The appeal form is available on the OLT website at Forms | Ontario Land Tribunal. In person payment can be made by certified cheque or money order made payable to the Ontario Minister of Finance, or by credit card. Please indicate on the appeal form if you wish to pay by credit card.
Please note only one of the above options needs to be completed. If your preferred method of appeal is not available at the time of filing, the appeal must be filed with one of the other two options.
The Ontario Land Tribunal has established a filing fee of $400.00 per type of application with an additional filing fee of $25.00 for each secondary application.
Only the applicant, the Minister or a specified person or public body that has an interest in the matter may appeal the decision to the Ontario Land Tribunal. A “specified person” does not include an individual or a community association.
There are no provisions for the Committee of Adjustment or the Ontario Land Tribunal to extend the statutory deadline to file an appeal. If the deadline is not met, the OLT does not have the authority to hold a hearing to consider your appeal.
If you have any questions about the appeal process, please visit File an Appeal | Ontario Land Tribunal
NOTICE TO APPLICANT
Should a Development Agreement be required, such request should be initiated 30 working days prior to lapsing date of the consent and should include all required documentation including that related to transfers, easements, and postponements, and all approved technical studies. If you do not fulfill the conditions of provisional consent within the two-year period, the Planning Act provides that your application “shall be deemed to be refused”.
Ce document est également offert en français.
Committee of Adjustment City of Ottawa Ottawa.ca/CommitteeofAdjustment cofa@ottawa.ca 613-580-2436
Comité de dérogation Ville d’Ottawa Ottawa.ca/Comitedederogation cded@ottawa.ca 613-580-2436
APPENDIX A
That the Owner(s) submit a request for municipal addresses for each parcel, as required, to be assigned by the City, to the satisfaction of the Chief Building Official, or their designate. Confirmation of the assigned municipal addresses shall be provided in writing from Municipal Addressing, Building Code Services, to the Committee.
Where a severance will create a vacant lot, the Owner/Applicant(s) will provide a Grading/Servicing Plan based on the conceptual building envelope created by the zoning of the proposed lot, to establish that the lot can be graded to a sufficient and legal outlet and has access to services with adequate capacity, while minimizing impacts to protected trees outside of the building envelope, including boundary and adjacent trees. The Tree Information Report must reflect any changes to the grading and servicing plan. These plans will be to the satisfaction of the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate.
That the Owner/Applicant(s) enter into a Development Agreement or a Letter of Undertaking (LOU) with the City of Ottawa, at the expense of the Owner/Applicant(s), and to the satisfaction of the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate. A development agreement is to be registered on title of the property (where applicable). The agreement/LOU will include the tree protection and mitigation requirements detailed in the Tree Protection By-law and the approved Tree Information Report (or any approved revisions), and associated securities for tree protection. The securities, which will be based on the value of the City tree(s) to be protected (Tree(s) 5) shall be retained for two (2) years following issuance of a final occupancy permit, and thereafter returned to the owner only upon the City having received a report from an arborist confirming that the identified tree(s) is/are healthy, retainable, and remain(s) structurally stable. The Owner(s) acknowledges and agrees that if, in the opinion of the City Forester and/or the Manager of Development Review All Wards Branch, the report indicates that any tree is declining and/or must be removed, the security for that tree, in its entirety, will be forfeited.
That the Owner(s) provide evidence, to the satisfaction of the Manager of Development Review All Wards, Planning, Development and Building Services Department, that each existing parcel has its own independent storm, sanitary and water services connected to City infrastructure and that these services do not cross the proposed severance line. If they do cross or are not independent, the Owner(s) will be required, at their own cost, to relocate the existing services or construct new services from the City sewers/watermain. Notice shall be provided in writing to the Committee from the Department confirming this condition has been fulfilled.
That the Owner(s) provide a Fire Flow Adequacy brief/memo, prepared by a Professional Engineer, licensed in the Province of Ontario, that assesses the fire flow demand including boundary conditions. The brief/memo shall be to the satisfaction of Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate.
That the Owner(s) provide proof that a grading and drainage plan, prepared by a qualified Civil Engineer, licensed in the Province of Ontario, an Ontario Land Surveyor or a Certified Engineering Technologist, delineating the existing and proposed grades for both the severed and retained lands has been provided to the satisfaction of the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate.
That the Owner provide a Slope Stability Analysis, prepared by a Professional Civil Engineer or professional geoscientist, licensed in the Province of Ontario, to the satisfaction of both the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department. Where the approved Grading Plan demonstrates the slope stability analysis is not required, based on the City’s Slope Stability Guidelines, the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate, shall deem this condition satisfied.
That the Owner(s) provide a Stormwater Management Report, prepared by a Professional Civil Engineer, licensed in the Province of Ontario, demonstrating a design for post-development stormwater peak flows that are controlled to pre-development peak flows for all stormwater events up to and including the 100-year storm event. The report shall be to the satisfaction of and approved by the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate.
If the Stormwater Management Report includes infiltration techniques, the Owner(s) must provide a supporting Geotechnical Brief prepared by a Professional Civil Engineer licensed in the Province of Ontario, for approval by the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate.
The Owner(s) shall enter into a Development Agreement with the City to construct the required stormwater system, which may include required securities. A copy of the Agreement and written confirmation from City Legal Services that it has been registered on title, shall be forwarded to the Committee of Adjustment.
If applicable, the Owner(s) shall obtain all necessary approvals from the Ontario Ministry of Environment, Conservation and Parks.
Should the stormwater management system cross property lines or access to the system be over multiple properties, that the owner will seek approval of the Committee to grant easement(s) for access and maintenance of the stormwater system or register a Joint Use and Maintenance Agreement on title of the properties, all at the owner(s) costs.
That the Owner(s) file with the Committee a copy of the registered Reference Plan prepared by an Ontario Land Surveyor registered in the Province of Ontario, and signed by the Registrar, confirming the frontage and area of the severed land. If the Registered Plan does not indicate the lot area, a letter from the Surveyor confirming the area is required. The Registered Reference Plan must conform substantially to the Draft Reference Plan filed with the Application for Consent to the satisfaction of the Secretary-Treasurer of the Committee of Adjustment or their designate.
That upon completion of the above conditions, and within the two-year period outlined above, the Owner(s) file with the Committee, the “electronic registration in preparation documents” for a severance for which the Consent is required to the satisfaction of the Secretary-Treasurer of the Committee of Adjustment or their designate.