DECISION CONSENT/SEVERANCE
Panel: 2 - Suburban
Files: D08-01-25/B-00157 & D08-01-25/B-00158
Application: Consent under section 53 of the Planning Act
Applicant: K. Enesi Saliu
Property Address: 2204 Boyer Road
Ward: 2 - Orléans West-Innes
Legal Description: Part of Lots 4 and 5, Concession 2 (Ottawa Front), Geographic Township of Gloucester Part 1 on Plan 5R-13013
Zoning: R2N
Zoning By-law: 2008-250
Heard: September 16, 2025, in person and by videoconference
APPLICANT’S PROPOSAL AND PURPOSE OF THE APPLICATIONS
1The Applicant wants to subdivide the property into two separate parcels of land for the construction of two long semi-detached dwellings with additional dwelling units. The existing buildings will be demolished.
CONSENT REQUIRED
2The Applicant seeks the Committee’s consent to sever land and grant easements/rights-of-way.
3The property is shown as Parts 1 to 4 on a survey plan filed with the applications and the separate parcels will be as follows:
Table 1 Proposed Parcels
| File No. | Frontage | Depth | Area | Part No. | Municipal Address |
|---|---|---|---|---|---|
| B-00157 | 10.38 m | 44.52 m (irregular) | 457.62 sq. m | 1 & 2 | 2202 Boyer Road |
| B-00158 | 10.38 m | 44.52 (irregular) | 462.15 sq. m | 3 & 4 | 2204 Boyer Road |
4It is proposed to establish the following reciprocal easements/rights-of-way:
- Over Part 2 in favour of Parts 3 and 4 for shared driveway access to parking.
- Over Part 3 in favour of part 1 and 2 for shared driveway access to parking.
5The property is not the subject of any other current application under the Planning Act.
PUBLIC HEARING
Oral Submissions Summary
6Coel Storey, agent for the Applicant, provided an overview of the applications. In response to written comments from a resident, Mr. Storey confirmed that the proposal is zoning compliant and that possible impacts to boundary trees would be addressed by the City’s request for a revised tree information report as a condition of provisional consent.
7Responding to questions from Panel, Mr. Storey confirmed that a privacy fence would be constructed at the sides and rear of the lot to reduce noise and other impacts on neighbours.
8City Planner Wendy Yang noted that the City’s requested condition requiring a Joint Use and Maintenance Agreement should be revised to include the wording “if required”. Responding to a question from the Panel, Ms. Yang also confirmed that an additional standard condition, not originally included in the City’s Planning Report, should be imposed to ensure that the existing building straddling the proposed lot line is demolished. City Planner James Ireland also acknowledged that the requirement for proof of independent services was addressed in two separate conditions in the Planning Report and confirmed that one of them (condition #2 in the Planning Report) could be deleted.
9Following the public hearing, the Committee reserved its decision.
DECISION AND REASONS OF THE COMMITTEE: APPLICATIONS GRANTED
Applications Must Satisfy Statutory Tests
10Under the Planning Act, the Committee has the power to grant a consent if it is satisfied that a plan of subdivision of the land is not necessary for the proper and orderly development of the municipality. Also, the Committee must be satisfied that an application is consistent with the Provincial Policy Statement and has regard for matters of provincial interest under section 2 of the Act, as well as the following criteria set out in subsection 51(24):
Criteria
(24) In considering a draft plan of subdivision, regard shall be had, among other matters, to the health, safety, convenience, accessibility for persons with disabilities and welfare of the present and future inhabitants of the municipality and to,
a) the effect of development of the proposed subdivision on matters of provincial interest as referred to in section 2;
b) whether the proposed subdivision is premature or in the public interest;
c) whether the plan conforms to the official plan and adjacent plans of subdivision, if any;
d) the suitability of the land for the purposes for which it is to be subdivided;
d.1) if any affordable housing units are being proposed, the suitability of the proposed units for affordable housing;
e) the number, width, location and proposed grades and elevations of highways, and the adequacy of them, and the highways linking the highways in the proposed subdivision with the established highway system in the vicinity and the adequacy of them;
f) the dimensions and shapes of the proposed lots;
g) the restrictions or proposed restrictions, if any, on the land proposed to be subdivided or the buildings and structures proposed to be erected on it and the restrictions, if any, on adjoining land;
h) conservation of natural resources and flood control;
i) the adequacy of utilities and municipal services;
j) the adequacy of school sites;
k) the area of land, if any, within the proposed subdivision that, exclusive of highways, is to be conveyed or dedicated for public purposes;
l) the extent to which the plan’s design optimizes the available supply, means of supplying, efficient use and conservation of energy; and
m) the interrelationship between the design of the proposed plan of subdivision and site plan control matters relating to any development on the land, if the land is also located within a site plan control area designated under subsection 41 (2) of this Act or subsection 114 (2) of the City of Toronto Act, 2006. 1994, c. 23, s. 30; 2001, c. 32, s. 31 (2); 2006, c. 23, s. 22 (3, 4); 2016, c. 25, Sched. 4, s. 8 (2).
Evidence
11Evidence considered by the Committee included all oral submissions made at the hearing, as highlighted above, and the following written submissions held on file with the Secretary-Treasurer and available from the Committee Coordinator upon request:
- Applications and supporting documents, including cover letter, plans, tree information report, photo of the posted sign, and a sign posting declaration.
- City Planning Report received September 11, 2025, with no concerns.
- Rideau Valley Conservation Authority email received September 12, 2025, with no objections.
- Hydro Ottawa email received September 8, 2025, with comments.
- A. Allen and B. Morton, residents, email received September 11, 2025, opposed.
Effect of Submissions on Decision
12The Committee considered all written and oral submissions relating to the applications in making its decision and granted the applications.
13The Committee notes that the City’s Planning Report raises “no concerns” regarding the applications, subject to the requested conditions agreed to by the Applicant’s agent.
14Based on the evidence, the Committee is satisfied that the proposal is consistent with the Provincial Policy Statement that promotes efficient land use and development as well as intensification and redevelopment within built-up areas, based on local conditions.
15The Committee is also satisfied that the proposal has adequate regard to matters of provincial interest, including the orderly development of safe and healthy communities; the appropriate location of growth and development; and the protection of public health and safety.
16Additionally, the Committee is satisfied that a plan of subdivision of the land is not necessary for the proper and orderly development of the municipality.
17Moreover, the Committee is satisfied that the proposal has adequate regard for the criteria specified under subsection 51(24) of the Planning Act and is in the public interest.
18THE COMMITTEE OF ADJUSTMENT ORDERS that the applications are granted and the provisional consent is to be given, subject to the conditions set out in Appendix A to this decision.
"Fabian Poulin" FABIAN POULIN VICE-CHAIR
"Jay Baltz" JAY BALTZ MEMBER
"George Barrett" GEORGE BARRETT MEMBER
"Heather MacLean" HEATHER MACLEAN MEMBER
"Julianne Wright" JULIANNE WRIGHT MEMBER
I certify this is a true copy of the Decision of the Committee of Adjustment of the City of Ottawa, dated September 26, 2025 “Michel Bellemare” MICHEL BELLEMARE SECRETARY-TREASURER
NOTICE OF RIGHT TO APPEAL
To appeal this decision to the Ontario Land Tribunal (OLT), a completed appeal form and the filing fee must be submitted via one of the below options and must be received no later than 3:00 p.m. on October 16, 2025.
- OLT E-FILE SERVICE – An appeal can be filed online through the E-File Portal . First-time users will need to register for a My Ontario Account. Select [Ottawa (City): Committee of Adjustment] as the Approval Authority. To complete the appeal, fill in all the required fields and provide the filing fee by credit card.
- BY EMAIL - Appeal packages can be submitted by email to cofa@ottawa.ca. The appeal form is available on the OLT website at Forms | Ontario Land Tribunal. Please indicate on the appeal form that payment will be made by credit card.
- IN PERSON – Appeal packages can be delivered to the Secretary-Treasurer, Committee of Adjustment, 101 Centrepointe Drive, 4th floor, Ottawa, Ontario, K2G 5K7. The appeal form is available on the OLT website at Forms | Ontario Land Tribunal. In person payment can be made by certified cheque or money order made payable to the Ontario Minister of Finance, or by credit card. Please indicate on the appeal form if you wish to pay by credit card.
Please note only one of the above options needs to be completed. If your preferred method of appeal is not available at the time of filing, the appeal must be filed with one of the other two options.
The Ontario Land Tribunal has established a filing fee of $400.00 per type of application with an additional filing fee of $25.00 for each secondary application.
Only the applicant, the Minister or a specified person or public body that has an interest in the matter may appeal the decision to the Ontario Land Tribunal. A “specified person” does not include an individual or a community association.
There are no provisions for the Committee of Adjustment or the Ontario Land Tribunal to extend the statutory deadline to file an appeal. If the deadline is not met, the OLT does not have the authority to hold a hearing to consider your appeal.
If you have any questions about the appeal process, please visit File an Appeal | Ontario Land Tribunal
NOTICE TO APPLICANT(S)
Should a Development Agreement be required, such request should be initiated 30 working days prior to lapsing date of the consent and should include all required documentation including that related to transfers, easements, and postponements, and all approved technical studies. If you do not fulfill the conditions of provisional consent within the two-year period, the Planning Act provides that your application “shall be deemed to be refused”.
Ce document est également offert en français.
Committee of Adjustment City of Ottawa Ottawa.ca/CommitteeofAdjustment cofa@ottawa.ca 613-580-2436
Comité de dérogation Ville d’Ottawa Ottawa.ca/Comitedederogation cded@ottawa.ca 613-580-2436
APPENDIX A
That the Owner(s) provide proof that payment has been made to the City of Ottawa for cash-in-lieu of the conveyance of land for park or other public recreational purposes, plus applicable appraisal cost. The value of the land otherwise required to be conveyed shall be determined by the City of Ottawa in accordance with the provisions of By-Law No. 2022-280, as amended. Information regarding the appraisal process can be obtained by contacting the Planner.
That the Owner(s) provide a Stormwater Management Report, prepared by a Professional Civil Engineer, licensed in the Province of Ontario, demonstrating a design for post-development stormwater peak flows that are controlled to predevelopment peak flows for all stormwater events up to and including the 100 year storm event. The report shall be to the satisfaction of and approved by the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate.
If the Stormwater Management Report includes infiltration techniques, the Owner(s) must provide a supporting Geotechnical Brief prepared by a Professional Civil Engineer licensed in the Province of Ontario, for approval by the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate.
That the Owner(s) enter into a Development Agreement with the City to construct the required stormwater system, including posting required securities. A copy of the Agreement and written confirmation from City Legal Services that it has been registered on title, shall be forwarded to the Committee of Adjustment
If applicable, the Owner(s) shall obtain an Environmental Compliance Approval from the Ontario Ministry of Environment, Conservation and Parks.
Should the stormwater management system cross property lines or access to the system be over multiple properties, that the owner will seek approval of the Committee to grant easement(s) for access and maintenance of the stormwater system or register a Joint Use and Maintenance Agreement on title of the properties, all at the owner(s) costs.
That the Owner(s) provide proof that a grading and drainage plan, prepared by a qualified Civil Engineer, licensed in the Province of Ontario, an Ontario Land Surveyor or a Certified Engineering Technologist, delineating the existing and proposed grades for both the severed and retained lands has been provided to the satisfaction of the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate.
That, if required, the Owner(s) enter into a Joint Use and Maintenance Agreement, at the expense of the Owner(s), setting forth the obligations between the Owner(s) and the proposed future owners with respect to the joint use and maintenance of all common elements including, but not limited to, the common party walls, common structural elements such as roof, footings, soffits, foundations, common areas, common driveways and common landscaping.
The Owner shall ensure that the Agreement is binding upon all unit owners and successors in title and shall be to the satisfaction of Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate, or City Legal Services. The Committee shall be provided written confirmation that the Agreement is satisfactory to the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate, or is satisfactory to City Legal Services, as well as a copy of the Agreement and confirmation that it has been registered on title.
That the Owner(s) enter into a Resurfacing Agreement with the City, to the satisfaction of the Program Manager, Right of Way Branch within the Planning, Development and Building Services Department, or their designate, and provide financial security in accordance with the Road Activity By-law, as amended, to install an asphalt overlay over the roadway surface of Boyer Road, fronting the subject lands, to the limits shown on the approved Site Servicing Plan. Where the approved Site Servicing Plan demonstrates the resurfacing is not required, based on the City’s Road Cut Resurfacing Policy, the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate, shall deem this condition satisfied
That the Owner(s) provide evidence to the satisfaction of both the Chief Building Official and Development Review Manager, Planning, Real Estate and Economic Development Department, or designates, that both severed and retained parcels have their own independent water, sanitary and storm connection as appropriate, and that these services do not cross the proposed severance line and are connected directly to City infrastructure. Further, the Owner(s) shall comply with 7.1.5.4(1) of the Ontario Building Code, O. Reg. 163/24 as amended. If necessary, a plumbing permit shall be obtained from Building Code Services for any required alterations.
That the Owner/Applicant(s) provide a revised Tree Information Report, to the satisfaction of the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate. This report shall be prepared by an Arborist, identifying all trees protected under the City's Tree Protection by-law, and meeting the standards of the City's Tree Information Report Guidelines, including an assessment of impacts related to the current site plan, and specific mitigation measures where work is proposed within the Critical Root Zone of a protected tree.
That the Owner/Applicant(s) provide a Grading and Servicing Plan, and Site Plan with the proposed elements (driveways, parking, retaining walls, projections, services, etc.) designed and located based on the least impact to protected trees and tree cover, as well as a revised Tree Information Report reflecting these changes to the satisfaction of the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate.
That the Owner(s) provide proof to the satisfaction of the Development Review Manager of All Wards Branch within Planning, Development and Building Services Department, or their designate, to be confirmed in writing from the Department to the Committee, that the existing dwelling/building has been removed.
That the Owner(s) file with the Committee a copy of the registered Reference Plan prepared by an Ontario Land Surveyor registered in the Province of Ontario, and signed by the Registrar, confirming the frontage and area of the severed land. If the Registered Plan does not indicate the lot area, a letter from the Surveyor confirming the area is required. The Registered Reference Plan must conform substantially to the Draft Reference Plan filed with the Application for Consent.
That upon completion of the above conditions, and within the two-year period outlined above, the Owner(s) file with the Committee, the “electronic registration in preparation documents” for the conveyances and grant of easements/rights-of-way for which the consent is required.