Committee of Adjustment / Comité de dérogation
DECISION CONSENT/SEVERANCE
Date of Decision: August 15, 2025
Panel: 1 - Urban
File Nos.: D08-01-25/B-00140 & D08-01-25/B-00141
Application: Consent under section 53 of the Planning Act
Applicant: D. Donato
Property Address: 581 Brunel Street
Ward: 13 - Rideau-Rockcliffe
Legal Description: Lot 4, Registered Plan 22 E/S Mary St (aka Brunel St)
Zoning: R2D
Zoning By-law: 2008-250
Heard: August 7, 2025, in person and by videoconference
APPLICANT’S PROPOSAL AND PURPOSE OF THE APPLICATIONS
1The Applicant wants to subdivide their property into two separate parcels for the construction of two long semi-detached dwellings, each with two additional dwelling units (for a total of 6 dwelling units on each parcel).
CONSENT REQUIRED
2The Applicant seeks the Committee’s consent to sever land. The property is shown as Parts 1 to 4 on a draft 4R-plan filed with the applications and the separate parcels will be as follows:
Table 1 Proposed Parcels
| File No. | Frontage | Depth | Area | Part No. | Municipal Address |
|---|---|---|---|---|---|
| B-00140 | 10.06 m | 35.28 m | 354 sq. m | 1 & 2 | 581 Brunel Street |
| B-00141 | 10.06 m | 35.28 m | 354 sq. m | 3 & 4 | 585 Brunel Street |
[3] It is proposed to establish the following easements/rights-of-way:
- Over Part 2 in favour of Parts 3 and 4 for vehicle, pedestrian access and parking.
- Over Part 3 in favour of Parts 1 and 2 for vehicle, pedestrian access and parking
4The property is not the subject of any other current application under the Planning Act.
PUBLIC HEARING
5At the scheduled hearing on July 23, 2025, the Committee adjourned the hearing of the applications to allow the Applicant time to submit a revised cover letter.
Oral Submissions Summary
6Jason Grant-Henley, agent for the Applicant, and City Planner Dylan Geldart were present.
7There were no objections to granting this unopposed application as part of the Panel’s fast-track consent agenda.
DECISION AND REASONS OF THE COMMITTEE: APPLICATIONS GRANTED
Applications Must Satisfy Statutory Tests
8Under the Planning Act, the Committee has the power to grant a consent if it is satisfied that a plan of subdivision of the land is not necessary for the proper and orderly development of the municipality. Also, the Committee must be satisfied that an application is consistent with the Provincial Policy Statement and has regard for matters of provincial interest under section 2 of the Act, as well as the following criteria set out in subsection 51(24):
Criteria
(24) In considering a draft plan of subdivision, regard shall be had, among other matters, to the health, safety, convenience, accessibility for persons with disabilities and welfare of the present and future inhabitants of the municipality and to,
a) the effect of development of the proposed subdivision on matters of provincial interest as referred to in section 2;
b) whether the proposed subdivision is premature or in the public interest;
c) whether the plan conforms to the official plan and adjacent plans of subdivision, if any;
d) the suitability of the land for the purposes for which it is to be subdivided;
d.1) if any affordable housing units are being proposed, the suitability of the proposed units for affordable housing;
e) the number, width, location and proposed grades and elevations of highways, and the adequacy of them, and the highways linking the highways in the proposed subdivision with the established highway system in the vicinity and the adequacy of them;
f) the dimensions and shapes of the proposed lots;
g) the restrictions or proposed restrictions, if any, on the land proposed to be subdivided or the buildings and structures proposed to be erected on it and the restrictions, if any, on adjoining land;
h) conservation of natural resources and flood control;
i) the adequacy of utilities and municipal services;
j) the adequacy of school sites;
k) the area of land, if any, within the proposed subdivision that, exclusive of highways, is to be conveyed or dedicated for public purposes;
l) the extent to which the plan’s design optimizes the available supply, means of supplying, efficient use and conservation of energy; and
m) the interrelationship between the design of the proposed plan of subdivision and site plan control matters relating to any development on the land, if the land is also located within a site plan control area designated under subsection 41 (2) of this Act or subsection 114 (2) of the City of Toronto Act, 2006. 1994, c. 23, s. 30; 2001, c. 32, s. 31 (2); 2006, c. 23, s. 22 (3, 4); 2016, c. 25, Sched. 4, s. 8 (2).
Evidence
9Evidence considered by the Committee included all oral submissions made at the hearing, as highlighted above, and the following written submissions held on file with the Secretary-Treasurer and available from the Committee Coordinator upon request:
- Applications and supporting documents, including cover letter, plans, tree information, photo of the posted sign, and a sign posting declaration.
- City Planning Report received July 31, 2025, with no concerns; received July 17, 2025.
- Rideau Valley Conservation Authority email received August 1, 2025, with no objections; received July 21, 2025, with no objections.
- Hydro Ottawa email received July 25, 2025, with comments; received July 14, 2025, with comments.
- Ontario Ministry of Transportation email received July 25, 2025, with no comments; received July 9, 2025, with no comments.
- Ottawa International Airport Authority email received July 4, 2025, with no comments.
Effect of Submissions on Decision
10The Committee considered all written and oral submissions relating to the applications in making its decision and granted the applications.
11The Committee notes that the City’s Planning Report raises “no concerns” regarding the applications, subject to the requested conditions agreed to by the Applicant’s agent.
12Based on the evidence, the Committee is satisfied that the proposal is consistent with the Provincial Policy Statement that promotes efficient land use and development as well as intensification and redevelopment within built-up areas, based on local conditions.
13The Committee is also satisfied that the proposal has adequate regard to matters of provincial interest, including the orderly development of safe and healthy communities; the appropriate location of growth and development; and the protection of public health and safety.
14Additionally, the Committee is satisfied that a plan of subdivision of the land is not necessary for the proper and orderly development of the municipality.
15Moreover, the Committee is satisfied that the proposal has adequate regard for the criteria specified under subsection 51(24) of the Planning Act and is in the public interest.
16THE COMMITTEE OF ADJUSTMENT ORDERS that the applications are granted and the provisional consent is to be given, subject to the conditions set out in Appendix A to this decision.
Absent ANN M. TREMBLAY CHAIR
"John Blatherwick" JOHN BLATHERWICK MEMBER
"Colin Haskin" COLIN HASKIN MEMBER
"Arto Keklikian" ARTO KEKLIKIAN MEMBER
"Sharon Lécuyer" SHARON LÉCUYER MEMBER
“Jocelyn Chandler” JOCELYN CHANDLER ACTING PANEL CHAIR
I certify this is a true copy of the Decision of the Committee of Adjustment of the City of Ottawa, dated August 15, 2025 “Michel Bellemare” MICHEL BELLEMARE SECRETARY-TREASURER
NOTICE OF RIGHT TO APPEAL
To appeal this decision to the Ontario Land Tribunal (OLT), a completed appeal form and the filing fee must be submitted via one of the below options and must be received no later than 3:00 p.m. on September 4, 2025.
OLT E-FILE SERVICE – An appeal can be filed online through the E-File Portal . First-time users will need to register for a My Ontario Account. Select [Ottawa (City): Committee of Adjustment] as the Approval Authority. To complete the appeal, fill in all the required fields and provide the filing fee by credit card.
BY EMAIL - Appeal packages can be submitted by email to cofa@ottawa.ca. The appeal form is available on the OLT website at Forms | Ontario Land Tribunal. Please indicate on the appeal form that payment will be made by credit card.
IN PERSON – Appeal packages can be delivered to the Secretary-Treasurer, Committee of Adjustment, 101 Centrepointe Drive, 4th floor, Ottawa, Ontario, K2G 5K7. The appeal form is available on the OLT website at Forms | Ontario Land Tribunal. In person payment can be made by certified cheque or money order made payable to the Ontario Minister of Finance, or by credit card. Please indicate on the appeal form if you wish to pay by credit card.
Please note only one of the above options needs to be completed. If your preferred method of appeal is not available at the time of filing, the appeal must be filed with one of the other two options.
The Ontario Land Tribunal has established a filing fee of $400.00 per type of application with an additional filing fee of $25.00 for each secondary application.
Only the applicant, the Minister or a specified person or public body that has an interest in the matter may appeal the decision to the Ontario Land Tribunal. A “specified person” does not include an individual or a community association.
There are no provisions for the Committee of Adjustment or the Ontario Land Tribunal to extend the statutory deadline to file an appeal. If the deadline is not met, the OLT does not have the authority to hold a hearing to consider your appeal.
If you have any questions about the appeal process, please visit File an Appeal | Ontario Land Tribunal
NOTICE TO APPLICANT
Should a Development Agreement be required, such request should be initiated 30 working days prior to lapsing date of the consent and should include all required documentation including that related to transfers, easements, and postponements, and all approved technical studies. If you do not fulfill the conditions of provisional consent within the two-year period, the Planning Act provides that your application “shall be deemed to be refused”.
Ce document est également offert en français.
Committee of Adjustment City of Ottawa Ottawa.ca/CommitteeofAdjustment cofa@ottawa.ca 613-580-2436
Comité de dérogation Ville d’Ottawa Ottawa.ca/Comitedederogation cded@ottawa.ca 613-580-2436
APPENDIX A
That the Owner(s) provide evidence, to the satisfaction of the Manager of Development Review All Wards, Planning, Development and Building Services Department, that each existing parcel has its own independent storm, sanitary and water services connected to City infrastructure and that these services do not cross the proposed severance line. If they do cross or are not independent, the Owner(s) will be required, at their own cost, to relocate the existing services or construct new services from the City sewers/watermain. Notice shall be provided in writing to the Committee from the Department confirming this condition has been fulfilled.
That the Owner(s) provide a Site Servicing Study including fire flow, prepared by a Professional Civil Engineer, licensed in the Province of Ontario, outlining the municipal servicing requirements for each unit and indicating, if required, that capacity exists within existing City infrastructure. The study shall be to the satisfaction of Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate.
That the Owner(s) provide a Stormwater Management Report, prepared by a Professional Civil Engineer, licensed in the Province of Ontario, demonstrating a design for post-development stormwater peak flows that are controlled to pre-development peak flows for all stormwater events up to and including the 100 year storm event. The report shall be to the satisfaction of and approved by the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate.
If the Stormwater Management Report includes infiltration techniques, the Owner(s) must provide a supporting Geotechnical Brief prepared by a Professional Civil Engineer licensed in the Province of Ontario, for approval by the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate.
That the Owner(s) enter into a Development Agreement with the City to construct the required stormwater system, including posting required securities. A copy of the Agreement and written confirmation from City Legal Services that it has been registered on title, shall be forwarded to the Committee of Adjustment.
If applicable, the Owner(s) shall obtain an Environmental Compliance Approval from the Ontario Ministry of Environment, Conservation and Parks.
Should the stormwater management system cross property lines or access to the system be over multiple properties, that the owner will seek approval of the Committee to grant easement(s) for access and maintenance of the stormwater system or register a Joint Use and Maintenance Agreement on title of the properties, all at the owner(s) costs.
That the Owner(s) provide proof that a grading and drainage plan, prepared by a qualified Civil Engineer, licensed in the Province of Ontario, an Ontario Land Surveyor or a Certified Engineering Technologist, delineating the existing and proposed grades for both the severed and retained lands has been provided to the satisfaction of the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate.
The Owner(s) shall:
Prepare a Noise Control Study, in compliance with the City of Ottawa Environmental Noise Control Guidelines, to the satisfaction of the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate. The Owner(s) shall enter into an agreement with the City, at the expense of the Owner(s), that requires the Owner(s) to implement any noise control attenuation measures recommended in the approved study. The Agreement shall also deal with any covenants/notices, recommended in the approved study, that shall run with the land and bind future owners on subsequent transfers, warning purchasers and/or tenants of expected noise levels due to the existing source of environmental noise (arterial, highway, airport, etc.). The Committee shall be provided a copy of the Agreement and written confirmation from City Legal Services that it has been registered on title.
Or
Design the dwelling units with the provision for adding central air conditioning at the occupant’s discretion and enter into an Agreement with the City, at the expense of the Owner, which is to be registered on title to deal with the covenants/ notices that shall run with the land and bind future owners on subsequent transfers, warning purchasers and/or tenants of expected noise levels due to the existing source of environmental noise. The Committee requires a copy of the Agreement and written confirmation from City Legal Services that it has been registered on title. The following two conditions will be included in the above-noted Agreement:
Notices-on-Title respecting noise:
i. “The Purchaser/Lessee for himself, his heirs, executors, administrators, successors and assigns acknowledges being advised that this dwelling unit has been fitted with a forced air heating system and the ducting, etc. was sized to accommodate central air conditioning. Installation of central air conditioning by the Purchaser/Lessee will allow windows and exterior doors to remain closed, thereby ensuring that the indoor sound levels are within the City of Ottawa’s and the Ministry of the Environment and Climate Change's noise criteria;” and
ii. “The Purchaser/Lessee for himself, his heirs, executors, administrators, successors and assigns acknowledges being advised that noise levels due to increasing roadway traffic may be of concern, occasionally interfering with some activities of the dwelling occupants as the outdoor sound level exceeds the City of Ottawa’s and the Ministry of the Environment and Climate Change’s noise criteria.”
- That the Owner(s) enter into a Joint Use and Maintenance Agreement, at the expense of the Owner(s), setting forth the obligations between the Owner(s) and the proposed future owners with respect to the joint use and maintenance of all common elements including, but not limited to common areas, common driveways and common landscaping.
The Owner shall ensure that the Agreement is binding upon all unit owners and successors in title and shall be to the satisfaction of Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate, or City Legal Services. The Committee shall be provided written confirmation that the Agreement is satisfactory to the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate, or is satisfactory to City Legal Services, as well as a copy of the Agreement and confirmation that it has been registered on title.
That the Owner(s) enter into a Resurfacing Agreement with the City, to the satisfaction of the Program Manager, Right of Way Branch within the Planning, Development and Building Services Department, or their designate, and provide financial security in accordance with the Road Activity By-law, as amended, to install an asphalt overlay over the roadway surface of Brunel Street, fronting the subject lands, to the limits shown on the approved Site Servicing Plan. Where the approved Site Servicing Plan demonstrates the resurfacing is not required, based on the City’s Road Cut Resurfacing Policy, the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate, shall deem this condition satisfied.
That the Owner(s) provide proof that payment has been made to the City of Ottawa for cash-in-lieu of the conveyance of land for park or other public recreational purposes, plus applicable appraisal cost. The value of the land otherwise required to be conveyed shall be determined by the City of Ottawa in accordance with the provisions of By-Law No. 2022-280, as amended. Information regarding the appraisal process can be obtained by contacting the Planner.
That the Owner/Applicant(s) provide a Grading and Servicing Plan with the proposed elements/structures (services, retaining walls, projections, etc.) designed and located to allow for the planting of new trees, as detailed in the Tree Information Report prepared by Dendron Forestry Services, and dated December 2nd, 2024. This plan will be to the satisfaction of the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate.
That the Owner(s) file with the Committee a copy of the registered Reference Plan prepared by an Ontario Land Surveyor registered in the Province of Ontario, and signed by the Registrar, confirming the frontage and area of the severed land. If the Registered Plan does not indicate the lot area, a letter from the Surveyor confirming the area is required. The Registered Reference Plan must conform substantially to the Draft Reference Plan filed with the Application for Consent.
That upon completion of the above conditions, and within the two-year period outlined above, the Owner(s) file with the Committee, the “electronic registration in preparation documents” for the conveyances for which the Consent is required.