Committee of Adjustment
Comité de dérogation
DECISION
CONSENT/SEVERANCE
Date of Decision: April 25, 2025
Panel: 2 - Suburban
File No.: D08-01-25/B-00056
Application: Consent under section 53 of the Planning Act
Applicants: Sandy-Belle Ghossein and Roy Imad
Property Address: 450 Tremblay Road
Ward: 18 - Alta Vista
Legal Description: Lots 140 & 141 and Part of Lots 139 & 937, Registered Plan 320
Zoning: R3M
Zoning By-law: 2008-250
Heard: April 15, 2025, in person and by videoconference
APPLICANTS’ PROPOSAL AND PURPOSE OF THE APPLICATION
1The Applicants want to subdivide their property into two separate parcels of land for the construction of a two-storey, semi-detached dwelling with additional dwelling units. The existing dwelling and accessory structure are to be demolished.
2On May 12, 2023, the Committee granted provisional consent (File No. D08-01- 23/B-00052) to subdivide the property into two lots. However, the conditions of provisional consent will not be fulfilled within the statutory time period and the application will be deemed to be refused under the Planning Act.
CONSENT REQUIRED
3The Applicants seeks the Committee’s consent to sever land.
4The property is shown as Parts 1 & 2 on a Draft 4R-plan filed with the application.
5The severed land, shown as Part 1 on a Draft 4R-plan, will have a frontage of 10.84 metres, a depth of 30.17 metres, and contain a lot area of 326.9 square metres. This parcel will contain one half of the proposed semi-detached dwelling and will be known municipally as 452 Tremblay Road.
6The retained land is shown as Part 2 on said plan, will have a frontage of 7.47 metres, a depth of 30.17 metres and a lot area of 225.4 square metres. This parcel will contain the other half of the proposed semi-detached dwelling and secondary dwelling unit in the basement and is known municipally as 450 Tremblay Road.
7The property is not the subject of any other current application under the Planning Act.
PUBLIC HEARING
Oral Submissions Summary
8Elie Ghossein, agent for the Applicants, and City Planner Nivethini Jekku Einkaran were present.
9There were no objections to granting this unopposed application as part of the Panel’s fast-track consent agenda.
DECISION AND REASONS OF THE COMMITTEE: APPLICATION GRANTED
Application Must Satisfy Statutory Tests
10Under the Planning Act, the Committee has the power to grant a consent if it is satisfied that a plan of subdivision of the land is not necessary for the proper and orderly development of the municipality. Also, the Committee must be satisfied that an application is consistent with the Provincial Policy Statement and has regard for matters of provincial interest under section 2 of the Act, as well as the following criteria set out in subsection 51(24):
Criteria
(24) In considering a draft plan of subdivision, regard shall be had, among other matters, to the health, safety, convenience, accessibility for persons with disabilities and welfare of the present and future inhabitants of the municipality and to,
a) the effect of development of the proposed subdivision on matters of provincial interest as referred to in section 2;
b) whether the proposed subdivision is premature or in the public interest;
c) whether the plan conforms to the official plan and adjacent plans of subdivision, if any;
d) the suitability of the land for the purposes for which it is to be subdivided;
d.1) if any affordable housing units are being proposed, the suitability of the proposed units for affordable housing;
e) the number, width, location and proposed grades and elevations of highways, and the adequacy of them, and the highways linking the highways in the proposed subdivision with the established highway system in the vicinity and the adequacy of them;
f) the dimensions and shapes of the proposed lots;
g) the restrictions or proposed restrictions, if any, on the land proposed to be subdivided or the buildings and structures proposed to be erected on it and the restrictions, if any, on adjoining land;
h) conservation of natural resources and flood control;
i) the adequacy of utilities and municipal services;
j) the adequacy of school sites;
k) the area of land, if any, within the proposed subdivision that, exclusive of highways, is to be conveyed or dedicated for public purposes;
l) the extent to which the plan’s design optimizes the available supply, means of supplying, efficient use and conservation of energy; and
m) the interrelationship between the design of the proposed plan of subdivision and site plan control matters relating to any development on the land, if the land is also located within a site plan control area designated under subsection 41 (2) of this Act or subsection 114 (2) of the City of Toronto Act, 2006. 1994, c. 23, s. 30; 2001, c. 32, s. 31 (2); 2006, c. 23, s. 22 (3, 4); 2006, c. 25, Sched. 4, s. 8 (2).
Evidence
11Evidence considered by the Committee included all oral submissions made at the hearing, as highlighted above, and the following written submissions held on file with the Secretary-Treasurer and available from the Committee Coordinator upon request:
Application and supporting documents, including cover letter, revised plans, tree information report, parcel register abstract, photo of the posted sign, and a sign posting declaration. City Planning Report received April 10, 2025, with no concerns.
Rideau Valley Conservation Authority email dated April 10, 2025, with no objections.
Hydro Ottawa email dated April 4, 2025, with comments.
Effect of Submissions on Decision
12The Committee considered all written and oral submissions relating to the application in making its decision and granted the application.
13The Committee notes that the City’s Planning Report raises “no concerns” regarding the application subject to the requested conditions agreed to by the Applicant’s agent.
14Based on the evidence, the Committee is satisfied that the proposal is consistent with the Provincial Policy Statement that promotes efficient land use and development as well as intensification and redevelopment within built-up areas, based on local conditions.
15The Committee is also satisfied that the proposal has adequate regard to matters of provincial interest, including the orderly development of safe and healthy communities; the appropriate location of growth and development; and the protection of public health and safety.
16Additionally, the Committee is satisfied that a plan of subdivision of the land is not necessary for the proper and orderly development of the municipality.
17Moreover, the Committee is satisfied that the proposal has adequate regard for the criteria specified under subsection 51(24) of the Planning Act and is in the public interest.
18THE COMMITTEE OF ADJUSTMENT ORDERS that the application is granted and the provisional consent is to be given, subject to the conditions set out in Appendix A to this decision.
Absent FABIAN POULIN VICE-CHAIR
Absent JAY BALTZ MEMBER
"George Barrett" GEORGE BARRETT ACTING PANEL CHAIR
"Heather MacLean" HEATHER MACLEAN MEMBER
"Julianne Wright" JULIANNE WRIGHT MEMBER
"Gary Duncan" GARY DUNCAN MEMBER
I certify this is a true copy of the Decision of the Committee of Adjustment of the City of Ottawa, dated April 25, 2025
“Michel Bellemare”
MICHEL BELLEMARE SECRETARY-TREASURER
NOTICE OF RIGHT TO APPEAL
To appeal this decision to the Ontario Land Tribunal (OLT), a completed appeal form and the filing fee must be submitted via one of the below options and must be received no later than 3:00 p.m. on May 15, 2025.
OLT E-FILE SERVICE – An appeal can be filed online through the E-File Portal . First-time users will need to register for a My Ontario Account. Select [Ottawa (City): Committee of Adjustment] as the Approval Authority. To complete the appeal, fill in all the required fields and provide the filing fee by credit card.
BY EMAIL - Appeal packages can be submitted by email to cofa@ottawa.ca. The appeal form is available on the OLT website at Forms | Ontario Land Tribunal. Please indicate on the appeal form that payment will be made by credit card.
IN PERSON – Appeal packages can be delivered to the Secretary-Treasurer, Committee of Adjustment, 101 Centrepointe Drive, 4th floor, Ottawa, Ontario, K2G 5K7. The appeal form is available on the OLT website at Forms | Ontario Land Tribunal. In person payment can be made by certified cheque or money order made payable to the Ontario Minister of Finance, or by credit card. Please indicate on the appeal form if you wish to pay by credit card.
Please note only one of the above options needs to be completed. If your preferred method of appeal is not available at the time of filing, the appeal must be filed with one of the other two options.
The Ontario Land Tribunal has established a filing fee of $400.00 per type of application with an additional filing fee of $25.00 for each secondary application.
Only the applicant, the Minister or a specified person or public body that has an interest in the matter may appeal the decision to the Ontario Land Tribunal. A “specified person” does not include an individual or a community association.
There are no provisions for the Committee of Adjustment or the Ontario Land Tribunal to extend the statutory deadline to file an appeal. If the deadline is not met, the OLT does not have the authority to hold a hearing to consider your appeal.
If you have any questions about the appeal process, please visit File an Appeal | Ontario Land Tribunal
NOTICE TO APPLICANTS
Should a Development Agreement be required, such request should be initiated 30 working days prior to lapsing date of the consent and should include all required documentation including that related to transfers, easements, and postponements, and all approved technical studies. If you do not fulfill the conditions of provisional consent within the two-year period, the Planning Act provides that your application “shall be deemed to be refused”.
Ce document est également offert en français.
Committee of Adjustment City of Ottawa Ottawa.ca/CommitteeofAdjustment cofa@ottawa.ca 613-580-2436
Comité de dérogation Ville d’Ottawa Ottawa.ca/Comitedederogation cded@ottawa.ca 613-580-2436
APPENDIX A
That the Owner(s) provide evidence that payment has been made to the City of Ottawa for cash-in-lieu of the conveyance of land for park or other public recreational purposes, plus applicable appraisal costs. The value of land otherwise required to be conveyed shall be determined by the City of Ottawa in accordance with the provisions of By-Law No. 2022-280, as amended. Information regarding the appraisal process can be obtained by contacting the Planner.
That the Owner(s) provide proof, to the satisfaction of the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate, that the existing dwelling/building has been demolished in accordance with the demolition permit. Notice shall be provided in writing to the Committee from the Department confirming this condition has been fulfilled.
That the Owner(s) provide proof, to the satisfaction of the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate, that the accessory structure has been demolished in accordance with the demolition permit if required or relocated in conformity with the Zoning By-law. Notice shall be provided in writing to the Committee from the Department confirming this condition has been fulfilled.
That the Owner(s) enter into a Joint Use and Maintenance Agreement, at the expense of the Owner(s), setting forth the obligations between the Owner(s) and the proposed future owners with respect to the joint use and maintenance of all common elements including, but not limited to, the common party walls, common structural elements such as roof, footings, soffits, and foundations.
The Owner shall ensure that the Agreement is binding upon all unit owners and successors in title and shall be to the satisfaction of Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate, or City Legal Services. The Committee shall be provided written confirmation that the Agreement is satisfactory to the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate, or is satisfactory to City Legal Services, as well as a copy of the Agreement and confirmation that it has been registered on title.
That the Owner/Applicant(s) provide a tree planting plan, prepared to the satisfaction of the Manager of the relevant Branch within the Planning, Development and Building Services Department, or their designate(s), showing the location(s) and species or ultimate size of at least one new tree (50 mm caliper) per lot, in addition to any compensation trees required under the Tree Protection By-law.
That the Owner/Applicant(s) provide a Grading and Servicing Plan with the proposed elements/structures (driveways, retaining walls, projections, services, etc.) designed and located based on the least impact to protected trees and tree cover, as well as a revised Tree Information Report reflecting these changes to the satisfaction of the Manager of the relevant Branch within the Planning, Development and Building Services Department, or their designate(s).
That the Owner/Applicant(s) provide a revised Tree Information Report, to the satisfaction of the Manager of the relevant Branch within the Planning, Development and Building Services Department, or their designate(s). This report shall be prepared by an Arborist, identifying all trees protected under the City's Tree Protection by-law, and meeting the standards of the City's Tree Information Report Guidelines, including an assessment of impacts related to the site plan, and specific mitigation measures where work is proposed within the Critical Root Zone of a protected tree.
That the Owner(s) provide evidence, to the satisfaction of the Manager of Development Review All Wards, Planning, Development and Building Services Department, that each existing parcel has its own independent storm, sanitary and water services connected to City infrastructure and that these services do not cross the proposed severance line. If they do cross or are not independent, the Owner(s) will be required, at their own cost, to relocate the existing services or construct new services from the City sewers/watermain. Notice shall be provided in writing to the Committee from the Department confirming this condition has been fulfilled.
That the Owner(s) provide proof that a grading and drainage plan, prepared by a qualified Civil Engineer, licensed in the Province of Ontario, an Ontario Land Surveyor or a Certified Engineering Technologist, delineating the existing and proposed grades for both the severed and retained lands has been provided to the satisfaction of the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate.
The Owner(s) shall prepare a noise attenuation study (or noise and vibration attenuation study if applicable) in compliance with the City of Ottawa Environmental Noise Control Guidelines to the satisfaction of to the satisfaction of the Manager of Development Review All Wards within Planning, Development and Building Services Department, or their designate. The Owner(s) shall enter into an agreement with the City that requires the Owner to implement any noise control (and vibration if applicable) attenuation measures recommended in the approved study. The Committee requires a copy of the Agreement and written confirmation from City Legal Services that it has been registered on title.
That the Owner enter into an Agreement with the City, at the expense of the Owner, which is to be registered on Title to deal with the covenants/notices that shall run with the land and bind future owners on subsequent transfers, warning purchasers and/or tenants of expected noise levels due to the existing source of environmental noise (Highway 417, Tremblay Road is a Major Collector Road, LRT corridor). The Agreement shall be to the satisfaction to the satisfaction of the Manager of Development Review All Wards within Planning, Development and Building Services Department, or their designate. The Committee requires a copy of the Agreement and written confirmation from City Legal Services that it has been registered on title.
That the Owner(s) enter into a Resurfacing Agreement with the City, to the satisfaction of the Program Manager, Right of Way Branch within the Planning, Development and Building Services Department, or their designate, and provide financial security in accordance with the Road Activity By-law, as amended, to install an asphalt overlay over the roadway surface of Insert ROW Name, fronting the subject lands, to the limits shown on the approved Site Servicing Plan. Where the approved Site Servicing Plan demonstrates the resurfacing is not required, based on the City’s Road Cut Resurfacing Policy, the Manager of Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate, shall deem this condition satisfied.
Pursuant to clause 51 (25) (c) of the Planning Act and Schedule C16 of the City’s Official Plan, the Owner conveys to the City, at no cost to the City, an unencumbered road widening across the complete Tremblay Road frontage of the lands, measuring 13 meters from the existing centerline of pavement/the abutting right-of-way. The exact widening must be determined by legal survey. The Owner shall provide a reference plan for registration, indicating the widening, to the City Surveyor for review and approval prior to its deposit in the Land Registry Office. Such reference plan must be tied to the Horizontal Control Network in accordance The Owner(s) must provide to the City Surveyor a copy of the Committee of Adjustment Decision and a draft Reference Plan that sets out the required widening. The Committee shall be provided written confirmation from City Legal Services that the transfer of the widening to the City has been registered. All costs shall be borne by the Owner.
The Owner conveys to the City, at no cost to the City, an unencumbered corner sight triangle, measuring 3m x 9m at the intersection of Tremblay Road and Avenue u. The corner sight triangle must be determined by legal survey. The Owner shall provide a reference plan for registration, indicating the corner sight triangle, to the City Surveyor for review and approval prior to its deposit in the Land Registry Office. Such reference plan must be tied to the Horizontal Control Network in accordance with the municipal requirements and guidelines for referencing legal surveys. The Owner(s) must provide to the City Surveyor a copy of the Committee of Adjustment Decision and a draft Reference Plan that sets out the required corner sight triangle. The Committee shall be provided written confirmation from City Legal Services that the transfer of the corner sight triangle to the City has been registered. All costs shall be borne by the Owner.
That the Owner(s) file with the Committee a copy of the registered Reference Plan prepared by an Ontario Land Surveyor registered in the Province of Ontario, and signed by the Registrar, confirming the frontage and area of the severed land. If the Registered Plan does not indicate the lot area, a letter from the Surveyor confirming the area is required. The Registered Reference Plan must conform substantially to the Draft Reference Plan filed with the Application for Consent.
That upon completion of the above conditions, and within the two-year period outlined above, the Owner(s) file with the Committee, the “electronic registration in preparation documents” for a severance for which the Consent is required.

