Committee of Adjustment / Comité de dérogation
DECISION
CONSENT/SEVERANCE
Date of Decision: September 13, 2024
Panel: 2 - Suburban
File No.: D08-01-24/B-00144
Application: Consent under Section 53 of the Planning Act
Applicant: Shawn Cowan
Property Address: 2894 Bank Street
Ward: 10 – Gloucester-Southgate
Legal Description: Lots 499 to 501, Part of Lots 566 to 568. Registered Plan 326. Geographic Township of Gloucester
Zoning: R1W & AM2 H(30)
Zoning By-law: 2008-250
Heard: September 3, 2024, in person and by videoconference
APPLICANT’S PROPOSAL AND PURPOSE OF THE APPLICATION
1The Applicant wants to subdivide their property into two separate parcels of land. The existing detached dwellings will remain.
CONSENT IS REQUIRED FOR THE FOLLOWING
2The Applicant requires the Committee’s consent to sever land. The property is shown as Parts 1 and 2 on a draft 4R-plan filed with the application.
3The severed land is shown as Part 1 on a draft 4R-plan. This lot will have a frontage of 30.42 metres (on Bank Street), an irregular depth, and a lot area of 1479.5 square metres. This lot is known municipally as 2894 Bank Street and will contain one of the existing detached dwellings.
4The retained land is shown as Part 2 on said plan, and will have a frontage of 15.25 metres, an irregular depth, and a lot area of 441.5 square metres. This lot is known municipally as 1648 Rosebella Avenue and will contain one of the existing detached dwellings.
5The property is not the subject of any other current application under the Planning Act.
PUBLIC HEARING
Oral Submissions Summary
6Ross Talarico, Agent for the Applicant, provided an overview of the application. Mr. Talarico questioned the need for the conditions outlined in the City’s Planning Report. Mr Talarico requested that the conditions be removed given that no development is proposed at this time.
7When questioned by the Committee, City Planner Elizabeth King confirmed that the condition requiring a Noise Attenuation Study accompanied by an agreement on title could be removed. She also confirmed that the rest are standard conditions of provisional consent when creating a new lot and should remain.
DECISION AND REASONS OF THE COMMITTEE: APPLICATION GRANTED
Application(s) Must Satisfy Statutory Tests
8Under the Planning Act, the Committee has the power to grant a consent if it is satisfied that a plan of subdivision of the land is not necessary for the proper and orderly development of the municipality. Also, the Committee must be satisfied that an application is consistent with the Provincial Policy Statement and has regard for matters of provincial interest under section 2 of the Act, as well as the following criteria set out in subsection 51(24):
Criteria
(24) In considering a draft plan of subdivision, regard shall be had, among other matters, to the health, safety, convenience, accessibility for persons with disabilities and welfare of the present and future inhabitants of the municipality and to,
a) the effect of development of the proposed subdivision on matters of provincial interest as referred to in section 2;
b) whether the proposed subdivision is premature or in the public interest;
c) whether the plan conforms to the official plan and adjacent plans of subdivision, if any;
d) the suitability of the land for the purposes for which it is to be subdivided;
d.1) if any affordable housing units are being proposed, the suitability of the proposed units for affordable housing;
e) the number, width, location and proposed grades and elevations of highways, and the adequacy of them, and the highways linking the highways in the proposed subdivision with the established highway system in the vicinity and the adequacy of them;
f) the dimensions and shapes of the proposed lots;
g) the restrictions or proposed restrictions, if any, on the land proposed to be subdivided or the buildings and structures proposed to be erected on it and the restrictions, if any, on adjoining land;
h) conservation of natural resources and flood control;
i) the adequacy of utilities and municipal services;
j) the adequacy of school sites;
k) the area of land, if any, within the proposed subdivision that, exclusive of highways, is to be conveyed or dedicated for public purposes;
l) the extent to which the plan’s design optimizes the available supply, means of supplying, efficient use and conservation of energy; and
m) the interrelationship between the design of the proposed plan of subdivision and site plan control matters relating to any development on the land, if the land is also located within a site plan control area designated under subsection 41 (2) of this Act or subsection 114 (2) of the City of Toronto Act, 2006. 1994, c. 23, s. 30; 2001, c. 32, s. 31 (2); 2006, c. 23, s. 22 (3, 4); 2016, c. 25, Sched. 4, s. 8 (2).
Evidence
9Evidence considered by the Committee included all oral submissions made at the hearing, as highlighted above, and the following written submissions held on file with the Secretary-Treasurer and available from the Committee Coordinator upon request:
Application and supporting documents, including cover letter, plans, photo of the posted sign, parcel abstract, and a sign posting declaration.
City Planning Report received August 29, 2024, with no concerns.
Rideau Valley Conservation Authority email received August 29, 2024, with no comments.
Effect of Submissions on Decision
10The Committee considered all written and oral submissions relating to the application in making its decision and granted the application.
11The Committee notes that the City’s Planning Report raises “no concerns” regarding the application, subject to the requested conditions. Also, the Committee finds that it is reasonable and appropriate to impose the requested conditions of provisional consent set out in the City’s Planning Report, except for the condition requiring a Noise Attenuation Study, which is not be imposed.
12Based on the evidence, the Committee is satisfied that the proposal is consistent with the Provincial Policy Statement that promotes efficient land use and development as well as intensification and redevelopment within built-up areas, based on local conditions. The Committee is also satisfied that the proposal has adequate regard to matters of provincial interest, including the orderly development of safe and healthy communities; the appropriate location of growth and development; and the protection of public health and safety. Additionally, the Committee is satisfied that a plan of subdivision of the land is not necessary for the proper and orderly development of the municipality. Moreover, the Committee is satisfied that the proposal has adequate regard for the criteria specified under subsection 51(24) of the Planning Act and is in the public interest.
13THE COMMITTEE OF ADJUSTMENT therefore grants the provisional consent, subject to the following conditions, which must be fulfilled within a two-year period from the date of this Decision:
That the Owner(s) provide evidence to the satisfaction of both the Chief Building Official and Development Review Manager, Planning, Development and Building Services Department, or designates, that both severed and retained parcels have their own independent water, sanitary and storm connection as appropriate, and that these services do not cross the proposed severance line and are connected directly to City infrastructure. Further, the Owner(s) shall comply to 7.1.5.4(1) of the Ontario Building Code, O. Reg. 332/12 as amended. If necessary, a plumbing permit shall be obtained from Building Code Services for any required alterations.
That the Owner enter into an Agreement with the City, at the expense of the Owner, which is to be registered on Title to deal with the covenants/notices that shall run with the land and bind future owners on subsequent transfers;
a. “The property is located next to lands that have an existing source of environmental noise (arterial road, and airport, etc) and may thereforebe subject to noise and other activities associated with that use”
b. The Agreement shall be to the satisfaction of Development Review All Wards Manager of the Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate. The Committee requires a copy of the Agreement and written confirmation from City Legal Services that it has been registered on title.
That the Owner(s) shall provide evidence that a grading and drainage plan, prepared by a qualified Civil Engineer licensed in the Province of Ontario, an Ontario Land Surveyor or a Certified Engineering Technologist, has been submitted to the satisfaction of Development Review All Wards Manager of the Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate to be confirmed in writing from the Department to the Committee. The grading and drainage plan shall delineate existing and proposed grades for both the severed and retained properties, to the satisfaction of Development Review All Wards Manager of the Development Review All Wards Branch within Planning, Development and Building Services Department, or their designate.
That the Owner convey a 3m x 9m corner sight triangle located at the intersection of Bank and Rosebella to the City, with all costs to be borne by the Owner(s), to the satisfaction of the Surveys and Mapping Branch of the City. This area will be free of all structures, plantings, etc. and will allow a proper sighting distance for motorists when performing turning movements within the intersection. The Committee must receive written confirmation from City Legal Services that the transfer of the lands to the City has been registered.
That the Owner acknowledges and agrees to convey to the City, at no cost to the City, an unencumbered road widening across the complete frontage of the lands, measuring 9.25 meters from the existing centerline of pavement/the abutting rightof-way along Rosebella, pursuant to Section 50.1(25)(c) of the Planning Act and Schedule C16 of the City’s new Official Plan, if required. The exact widening must be determined by legal survey. The Owner shall provide a reference plan for registration, indicating the widening, to the City Surveyor for review and approval prior to its deposit in the Land Registry Office. Such reference plan must be tied to the Horizontal Control Network in accordance with the municipal requirements and guidelines for referencing legal surveys. The Owner(s) must provide to the City Surveyor a copy of the Committee of Adjustment Decision and a draft Reference Plan that sets out the required widening. The Committee requires written confirmation from City Legal Services that the transfer of the widening to the City has been registered. All costs shall be borne by the Owner.
That the Owner acknowledges and agrees to convey to the City, at no cost to the City, an unencumbered road widening across the complete frontage of the lands, measuring 22.25 meters from the existing centerline of pavement/the abutting right-of-way along Bank St, pursuant to Section 50.1(25)(c) of the Planning Act and Schedule C16 of the City’s new Official Plan, if required. The exact widening must be determined by legal survey. The Owner shall provide a reference plan for registration, indicating the widening, to the City Surveyor for review and approval prior to its deposit in the Land Registry Office. Such reference plan must be tied to the Horizontal Control Network in accordance with the municipal requirements and guidelines for referencing legal surveys. The Owner(s) must provide to the City Surveyor a copy of the Committee of Adjustment Decision and a draft Reference Plan that sets out the required widening. The Committee requires written confirmation from City Legal Services that the transfer of the widening to the City has been registered. All costs shall be borne by the Owner.
Should an existing building be within the road widening the requirement for taking that part of the road widening may be waived by the Director, Planning Services or their delegate.
That the Owner(s) file with the Committee a copy of the registered Reference Plan prepared by an Ontario Land Surveyor registered in the Province of Ontario, and signed by the Registrar, confirming the frontage and area of the severed land. If the Registered Plan does not indicate the lot area, a letter from the Surveyor confirming the area is required. The Registered Reference Plan must conform substantially to the Draft Reference Plan filed with the Application for Consent.
That upon completion of the above conditions, and within the two-year period outlined above, the Owner(s) file with the Committee, the “electronic registration in preparation documents” for a Conveyance for which the Consent is required.
Fabian Poulin FABIAN POULIN VICE-CHAIR
Absent JAY BALTZ MEMBER
George Barrett GEORGE BARRETT MEMBER
Heather MacLean HEATHER MACLEAN MEMBER
Julianne Wright JULIANNE WRIGHT MEMBER
I certify this is a true copy of the Decision of the Committee of Adjustment of the City of Ottawa, dated September 13, 2024.
“Michel Bellemare” MICHEL BELLEMARE SECRETARY-TREASURER
NOTICE OF RIGHT TO APPEAL
To appeal this decision to the Ontario Land Tribunal (OLT), a completed appeal form along with payment must be received by the Secretary-Treasurer of the Committee of Adjustment by October 3, 2024, delivered by email at cofa@ottawa.ca and/or by mail or courier to the following address:
Secretary-Treasurer, Committee of Adjustment, 101 Centrepointe Drive, 4th floor, Ottawa, Ontario, K2G 5K7
The Appeal Form is available on the OLT website at https://olt.gov.on.ca/. The Ontario Land Tribunal has established a filing fee of $400.00 per type of application with an additional filing fee of $25.00 for each secondary application. Payment can be made by certified cheque or money order made payable to the Ontario Minister of Finance, or by credit card. Please indicate on the Appeal Form if you wish to pay by credit card. If you have any questions about the appeal process, please contact the Committee of Adjustment office by calling 613-580-2436 or by email at cofa@ottawa.ca.
Only the applicant, the Minister or a specified person or public body that has an interest in the matter may appeal the decision to the Ontario Land Tribunal. A “specified person” does not include an individual or a community association.
There are no provisions for the Committee of Adjustment or the Ontario Land Tribunal to extend the statutory deadline to file an appeal. If the deadline is not met, the OLT does not have the authority to hold a hearing to consider your appeal.
If a major change to condition(s) is requested, you will be entitled to receive Notice of the changes only if you have made a written request to be notified.
NOTICE TO APPLICANT(S)
All technical studies must be submitted to the Planning, Development and Building Services Department a minimum of 40 working days prior to lapsing date of the consent. Should a Development Agreement be required, such request should be initiated 15 working days prior to lapsing date of the consent and should include all required documentation including the approved technical studies.
Ce document est également offert en français.
Committee of Adjustment City of Ottawa Ottawa.ca/CommitteeofAdjustment cofa@ottawa.ca 613-580-2436
Comité de dérogation Ville d’Ottawa Ottawa.ca/Comitedederogation cded@ottawa.ca 613-580-2436

