Ontario Land Tribunal
Tribunal ontarien de l’aménagement du territoire
ISSUE DATE: August 15, 2022
CASE NO(S).: OLT-21-001689
(Formerly PL180139)
PROCEEDING COMMENCED UNDER subsection 34(11) of the Planning Act, R.S.O. 1990, c. P.13, as amended
Applicant and Appellant: 2519371 Ontario Inc.
Subject: Application to amend Zoning By-law Nos. 7625 and 569-2013 - Refusal or neglect of the City of Toronto to make a decision
Existing Zoning: Site General Commercial Zone (Cl)
Proposed Zoning: Site Specific (To be determined)
Purpose: To permit a 14-storey residential building
Property Address/Description: 4155 Yonge Street
Municipality: City of Toronto
Municipality File No.: 17 245489 NNY 25 OZ
OLT Case No.: OLT-21-001689
Legacy Case No.: PL180139
OLT Lead Case No.: OLT-21-001689
Legacy Lead Case No.: PL180139
OLT Case Name: 2519371 Ontario Inc. v. Toronto (City)
PROCEEDING COMMENCED UNDER subsection 22(7) of the Planning Act, R.S.O. 1990, c. P.13, as amended
Applicant and Appellant: 2519371 Ontario Inc.
Subject: Request to amend the Official Plan - Failure of the City of Toronto to adopt the requested amendment
Existing Designation: Mixed Use Area
Proposed Designated: Site Specific (To be determined)
Purpose: To permit a 14-storey residential building
Property Address/Description: 4155 Yonge Street
Municipality: City of Toronto
Approval Authority File No.: 17 245489 NNY 25 OZ
OLT Case No.: OLT-21-001413
Legacy Case No.: PL180139
OLT Lead Case No.: OLT-21-001689
Heard: July 4, 2022 via Video Hearing
APPEARANCES:
Parties
Counsel
2519371 Ontario Inc.
Jane Pepino
City of Toronto
Robert Robinson
MEMORANDUM OF ORAL DECISION DELIVERED BY CARMINE TUCCI ON JULY 4, 2022 AND ORDER OF THE TRIBUNAL
1Prior to the commencement of the Case Management Conference, the Parties confirmed that settlement had been reached and the settlement was presented for the consideration of the Tribunal.
22519371 Ontario Inc. (the “Applicant”) had appealed its applications for Official Plan Amendment (“OPA”) and Zoning By-law Amendment (“ZBA”) to the Tribunal on the failure of the City of Toronto (“City”) to make a decision within the statutory time period for its property at 4155 Yonge Street (the “Site”).
3Uncontested opinion evidence was given to supplement the affidavit sworn by Eldon C. Theodore, on June 27, 2022. Mr. Theodore was qualified to assist the Tribunal with opinion evidence in areas of land use planning. Mr. Theodore provided extensive oral, written and visual evidence as contained in his affidavit.
4Mr. Theodore explained how:
the Tribunal heard the Settlement Proposal will permit an 11-storey residential building on the western portion of the Site with a height of 37.50 metres (42.50 metres to the top of the mechanical penthouse). The proposed gross floor area is approximately 7,130 square metres, resulting in a Floor Space Index (“FSI”) of 2.21;
the development proposal is consistent with the Provincial Policy Statement, 2020 and conforms to the Growth Plan for the Greater Golden Horseshoe, 2020, as amended;
the OPA and the ZBA, attached as Exhibit O and P respectively to his affidavit and appended to this Order as Schedules A and B, reflect the settlement plans and provide appropriate regulations and performance standards so as to conform to the in-force policies of the City of Toronto Official Plan; and,
the proposed development and the OPA and ZBA represent good planning and are in the public interest.
FINDINGS
5The Tribunal accepts the uncontroverted evidence of Mr. Theodore in support of the settlement proposal and allows the proposed intensification of the Site substantially in accordance with the draft OPA and the draft ZBA (attached to Mr. Theodore’s sworn affidavit as Exhibit O and Exhibit P respectively and to this Decision and Order as Schedules A and B respectively).
INTERIM ORDER
6THE TRIBUNAL ORDERS on an interim basis, contingent upon confirmation, satisfaction or receipt of those pre-requisite matters identified in paragraph [7] below THAT the appeals are allowed in part, and the Official Plan Amendment and Zoning By-law Amendments set out in Schedules A and B attached to this Order, are hereby approved in principle.
7The Tribunal withholds its Final Order until such confirmation, satisfaction or receipt from the Parties in writing, of the following pre-requisite matters:
The Official Plan Amendment and Zoning By-law Amendments are in a final form satisfactory to the City of Toronto;
The Owner has submitted revised technical reports and plans, including a revised Functional Servicing Report, a revised Stormwater Management Report, a revised Hydrogeological Report, and any other reports or documents deemed necessary in support of the development to the City of Toronto for review and acceptance by and to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services.
8The Tribunal Member remains seized for the issuance of a Final Order and with respect to such outstanding matters relating to this interim Order and may be spoken to concerning matters relating to this interim Order and the issuance of the Final Order.
“Carmine Tucci”
Carmine tucci
membeR
Ontario Land Tribunal
Website: olt.gov.on.ca Telephone: 416-212-6349 Toll Free: 1-866-448-2248
The Conservation Review Board, the Environmental Review Tribunal, the Local Planning Appeal Tribunal and the Mining and Lands Tribunal are amalgamated and continued as the Ontario Land Tribunal (“Tribunal”). Any reference to the preceding tribunals or the former Ontario Municipal Board is deemed to be a reference to the Tribunal.
SCHEDULE A
SCHEDULE B