PROCEEDING COMMENCED UNDER subsection 34(11) of the Planning Act, R.S.O. 1990, c. P.13, as amended
Applicant and Appellant: Tammy Abbotts
Subject: Application to amend Zoning By-law No. 2018-65 - Refusal or neglect of County of Grey to make a decision
Existing Zoning: Residential One (R1-1)
Proposed Zoning: Residential Two (R2)
Purpose: To permit the creation of lots for 22 semi-detached dwellings
Property Address/Description: Lots 35-39, SW Side of Bay Street
Municipality: Town of The Blue Mountains
Municipality File No.: P2832
OLT Case No.: OLT-22-002269
Legacy Case No.: PL210156
OLT Lead Case No.: OLT-22-002269
Legacy Lead Case No.: PL210156
OLT Case Name: Abbotts v. Blue Mountains (Town)
PROCEEDING COMMENCED UNDER subsection 51(34) of the Planning Act, R.S.O. 1990, c. P.13, as amended
Applicant and Appellant: Tammy Abbotts
Subject: Proposed Plan of Subdivision - Failure of County of Grey to make a decision
Purpose: To permit the creation of lots for 22 semi-detached dwellings
Property Address/Description: Lots 35-39, SW Side of Bay Street
Municipality: Town of The Blue Mountains
Municipality File No.: 42T-2019-02
OLT Case No.: OLT-22-002272
Legacy Case No.: PL210152
OLT Lead Case No.: OLT-22-002269
Legacy Lead Case No.: PL210156
Heard: May 24-26, 2022 by video hearing
APPEARANCES:
| Parties | Counsel |
|---|---|
| Tammy Abbots (“Appellant”) | Al Burton |
| Town of The Blue Mountains (“Town”) | Leo Longo |
| County of Grey (“County”) | Errol Treslan |
| Grey Condominium Corporation No. 11 (“GCC11”) | Samantha Lampert, Grace O’Brien |
| Harbour West Residents Group Inc. (“HWRG”) | Harry Burkman |
DECISION DELIVERED BY T. PREVEDEL AND INTERIM ORDER OF THE TRIBUNAL
Introduction
1The matter before the Tribunal is an appeal by Tammy Abbots (“Appellant”) under subsections 34(11) and 51(34) of the Planning Act with respect to the Town of The Blue Mountains’ and the County of Grey’s failure to deal with the Appellant’s proposed application for a Zoning By-law Amendment and associated Draft Plan of Subdivision within the prescribed timeframe.
2The lands are legally described as Lots 35-39, Southwest Side of Bay Street, Former Town of Thornbury, Town of The Blue Mountains, County of Grey. The subject lands consist of a 1.01-hectare site that is currently vacant and is designated as "Community Living Area" in the Town of The Blue Mountains Official Plan ("Town OP").
Area Context
3The subject lands are located in the Northwest quadrant of Thornbury, between existing residential uses along Lakeshore Drive and Huron Street on the East side of Lansdowne Street North, and South of the unopened Bay Street West road allowance. The subject lands are vacant lots with frontage on Lansdowne Street North and the unconstructed road allowances of Bay Street West and Victoria Street North.
4Under the Town's OP, the subject lands are currently designated “Community Living Area". They are currently zoned R-1 and are within holding zone areas H3 and H4A within the Town’s Zoning By-law 2018-65.
The Settlement Proposal
5The Tribunal received, on May 16, 2022, executed Minutes of Settlement between the Appellant, the Town, the County and GCC11. The Parties also submitted a draft Zoning By-Law and a revised Draft Plan of Subdivision along with Conditions of Draft Plan Approval, which were attached to the Minutes of Settlement.
6The revised proposal reduces the number of proposed lots from 22 to 20, consisting of 4 single detached lots and 16 semi-detached lots. The subject lands have a total area of approximately 1.01 hectares, resulting in a proposed density of approximately 20 units per gross hectare.
7The proposed units will have “as of right” zoning permissions for accessory apartments under the Zoning By-law.
8The Harbour West Residents Group Inc. (“HWRG”) has not consented to this proposed settlement.
PRELIMINARY MATTERS
9The Tribunal received and marked the following documents as Exhibits to the Hearing:
- Exhibit 1 – Joint Document Book
- Exhibit 2 – Minutes of Settlement dated April 18, 2022
- Exhibit 3 – Township of The Blue Mountains (“TBM”) Supplementary Document Book
- Exhibit 4 – HWRG Supplementary Document Book
- Exhibit 5 – Agreed Statement of Facts (“ASF”)
- Exhibit 6 – TBM’s Cross-examination documents for Scott Taylor
- Exhibit 7 – HWRG’s Witness Examination Book
- Exhibit 8 – Scott Taylor’s Acknowledgement of Expert’s Duty
- Exhibit 9 – HWRG Preliminary Matters
- Exhibit 10 – Index for Visual evidence by HWRG
- Exhibit 11 – Gordon Russell version of ASF, not signed
- Exhibit 12 – Affordable Price Points in the Town of The Blue Mountains, May 2022
10The Tribunal dealt with several technical objections raised by Mr. Burkman, counsel for the HWRG, prior to the start of the evidentiary portion of the Hearing:
A. Inclusion of Tabs 5, 6 and 7 in the Joint Document Book (Exhibit 1)
11Mr. Burkman questioned which applications were actually before the Tribunal at this point in time, as the proposed development has undergone some revisions to reach a settlement. He submitted that Tabs 5, 6 and 7, which contain the revised Draft Plan and Zoning By-Law with Schedules, should be removed as these documents have not been formally submitted to the Tribunal.
12Mr. Burton, on behalf of the Appellant, submitted that Mr. Burkman was not familiar with the normal planning process before the Tribunal, and that it is often the case where Parties work together in advance of a Hearing to scope issues and make revisions in an effort to reach a settlement and reduce Hearing time before the Tribunal.
13This submission was supported by Messrs. Longo and Treslan, on behalf of the Town and County, respectively.
14Upon consideration of the matter, the Tribunal agrees with the settling Parties that Mr. Burkman’s objection has no merit and that Tabs 5, 6 and 7 are to remain in the Joint Document Book.
B. Should the Applications be considered complete?
15Mr. Burkman questioned whether the applications before the Tribunal should be deemed complete. He submitted that, as the proposed plan has undergone several submissions, no additional background studies have been submitted in support.
16Mr. Burton disagreed with Mr. Burkman’s submission, stating that the revisions to the plan have been minor in nature and undertaken in consultation with the other Parties.
17The Tribunal notes that the applications have been processed by both the Town and County staff, resulting in a proposed settlement on consent of all Parties except HWRG. There is no question that the applications should be considered complete.
C. Request to add some additional issues to the Issues List
18Mr. Burkman, on behalf of HWRG, requested that two additional issues be added to the Issues List: namely subsection 24 of the Planning Act and Policy D2.3.1 of the Town’s OP, both relating to various aspects of public works and road classifications.
19The other Parties objected to this request, stating that no formal Motion has been brought forward, no evidence relating to these issues has been submitted, and HWRG has been silent regarding the Procedural Order (“PO”) since its July 23, 2021, issuance.
20The Tribunal notes that paragraph 5 of the PO explicitly states that there will be no changes to the Issues List unless the Tribunal permits. There does not appear to be any merit in adding these two additional issues to the proceeding, and the Tribunal notes that counsel for HWRG can cross-examine the Appellant’s witnesses regarding these matters.
21The request to add the two additional issues is denied.
THE HEARING
22The Hearing of the appeal took place over the course of three days. The conduct of the Hearing was governed by a Procedural Order issued on July 23, 2021.
23At the onset of the Hearing, it was agreed that the Appellant would call evidence in support of the proposed settlement. It was also agreed that no other Parties would call evidence, unless specifically requested to do so by the Tribunal or as a necessary response to any issue raised by the non-settling Party, HWRG.
24The Town and the Appellant also agreed that the Town would call evidence in support of a request by the Town that the Appellant, without compensation, would provide six accessory apartments to be offered as affordable housing, and that the Appellant would offer the right of first refusal of the administration of such units to The Blue Mountains Attainable Housing Corporation.
25The Tribunal heard from 5 expert witnesses, on behalf of the Parties. The land use planning and engineering witnesses were qualified to provide expert evidence in their respective fields, as follows:
Appellant’s Witnesses
Kristine A. Loft - land use planning
Alexander Fleming – transportation engineering
George Cooper – civil engineering
County’s Witness
Scott Taylor – land use planning
HWRG Witness
Gordon H. Russell – land use planning
26Mr. Burton made submissions to the Tribunal, expressing his concern that the witness for HWRG should not be qualified, in his opinion, he was not providing independent expert evidence but rather acting as an advocate for HWRG. He made particular reference to Mr. Russell’s reliance on the Thornbury Density and Intensification Study Report, dated February 2022 in his evidence, which he admitted would be advantageous to his client.
27The Tribunal agrees that, in accordance with the “Clergy Principle”, the above-noted study, which has no status at this point, has no relevance and should not be relied on as a planning instrument during this Hearing.
28Notwithstanding Mr. Burton’s concerns, the Tribunal feels that not qualifying Mr. Russell as an expert witness would be prejudicial to HWRG’s case in these proceedings. The Tribunal qualified the witness on the condition that he makes no reference to the Intensification Study during his testimony.
29The Town called two witnesses regarding the issue of affordable housing: Alar Soever, Mayor of the Town and Robert Sampson, a Councillor with the Town and Chair of the Blue Mountain Attainable Housing Corporation.
30Ms. Lampert, on behalf of GCC11, stated that her client was one of the settling Parties and would not be taking an active role in these proceedings. Ms. Grace O’Brien, co-counsel for GCC11, would monitor the balance of the Hearing.
31As noted earlier in this Decision, the Appellant has reached a settlement agreement with the Town, the County and the GCC11.
32The HWRG have not consented to the settlement agreement and are calling a case which centres around the concerns of the neighbours that the proposed development is not compatible with the existing built form, and does not conform to the Town’s OP.
33The broader issue, and the one which was most contested, was the “last minute” request by the Town to add a condition requesting that the Appellant provide six accessory units as affordable housing units. This issue will be discussed separately later in this Decision.
PLANNING EVIDENCE
34Mr. Taylor provided the Tribunal with a chronological overview of the background to this development starting in late 2019 when the Town and County received a plan of subdivision application to create 22 new residential dwellings (11 semi-detached lots) along with a Zoning By-Law amendment application.
35He stated that the five Parties to the Hearing have met to discuss issues and potential settlement options. The most recent proposal is a revised plan of subdivision to create four single detached residential dwellings and 16 semi-detached dwellings. HWRG put forth a revised plan of subdivision proposal to create 11 single detached residential dwellings and six semi detached dwellings. In both proposals, the new residential units would gain access from an extension of Bay Street West to be serviced by municipal water and sewer services.
36County staff brought forward an in-camera report to the County Committee of the Whole on March 24, 2022, seeking direction on the proposed settlement. At that meeting, the staff recommendation was supported by the Committee.
37The proposed conceptual plan of subdivision, which forms part of the Minutes of Settlement, is presented graphically in the figure below:
THE ISSUES
38The Tribunal must have regard to matters of provincial interest under the Planning Act and be consistent with the Provincial Policy Statement, 2020 (PPS) when rendering decisions on planning applications. The Tribunal must also ensure that the proposal conforms to the County’s OP, the Town’s OP, is good planning and is in the public interest.
39Despite the settlement agreement amongst the Appellant, Town, County and GCC11, there are twelve (12) issues raised by the HWRG which remain in dispute. HWRG has refused to remove any of these issues and has not called any engineering evidence.
PROVINCIAL POLICY STATEMENT
40The PPS provides policy direction on matters of provincial interest related to land use planning and development in Ontario. This PPS was issued under section 3 of the Planning Act and came into effect on May 1st, 2020.
41Although consistency with the PPS was not flagged in the Issues List, both County and Appellant expert witnesses have provided comments.
42Mr. Taylor submitted that a key goal of the PPS is directing new growth to serviced settlement areas and promoting the vitality of such settlement areas through re-development, infill and intensification. The subject lands have been primarily designated for residential growth and are within a serviced settlement area.
43Ms. Loft opined that the approval of the proposed Draft Plan and Zoning By-law Amendment to permit single and semi-detached units on the subject lands is consistent with the PPS and specifically Section 1.1.1 – “Managing and Directing Land Use to Achieve Efficient and Resilient Development and Land Use Patterns”.
44She stated that the proposal would accommodate new population growth on vacant land in an area that can be serviced and is within a defined settlement area. She also opined that the proposal would incorporate an appropriate range and mix of residential uses in a compact form to meet the long-term needs of the community.
45Ms. Loft submitted that the proposal would assist the Town in meeting its intensification and density targets set by the County’s OP.
46Ms. Loft further opined that the proposal would promote active transportation by connecting the proposed development to the surrounding neighborhood with trail connectivity.
47In conclusion, Ms. Loft opined that the proposal is consistent with the PPS.
48This opinion was echoed by Mr. Taylor, the County’s witness.
49Mr. Russell did not address the PPS in his written or oral testimony.
50The Tribunal agrees with Ms. Loft that the proposed development is consistent with the PPS.
Issue One: Does the proposed development have appropriate regard to [sections 34](https://www.canlii.org/en/on/laws/stat/rso-1990-c-p13/latest/rso-1990-c-p13.html#sec34_smooth), [36](https://www.canlii.org/en/on/laws/stat/rso-1990-c-p13/latest/rso-1990-c-p13.html#sec36_smooth) and [51(24)](https://www.canlii.org/en/on/laws/stat/rso-1990-c-p13/latest/rso-1990-c-p13.html#sec51subsec24_smooth) of the [Planning Act](https://www.canlii.org/en/on/laws/stat/rso-1990-c-p13/latest/rso-1990-c-p13.html)?
51Ms. Loft provided the Tribunal with a thorough overview of subsection 51(24) of the Planning Act, which outlines matters to be considered when considering Draft Plans of Subdivision.
52She opined that the proposed development is not premature and is in the public interest, as it is located within the settlement area of the Town and is designated and zoned for residential development. Furthermore, she opined that the proposed development assists in implementing the matters of provincial interest outlined is subsection 2 of the Planning Act.
53She also stated that the subject lands are ideally suited for the proposed development, as they are within the settlement area and are located within the built-up area of Thornbury. The subject lands have access to existing municipal water and sewage services and transportation infrastructure. The standard H41 holding symbol, which remains on the subject lands, is subject to municipal water and sanitary sewage capacity being made available to service the development.
54Ms. Loft opined that the proposed development conforms to the County’s OP and the Town’s OP and that the development is compatible with adjacent development.
55Ms. Loft also stated that the proposed draft plan has been designed with consistent frontage, taking into consideration the elongated shape of the site along the Bay Street West road allowance. This plan will allow for efficient pedestrian and vehicular movements. Additionally, the proposed development has been designed to an appropriate density to allow for the efficient use of land.
56Mr. Taylor, representing the County, was in total agreement with the professional opinions expressed by Ms. Loft.
57Mr. Russell, on behalf of HWRG, submitted that he formalized his opinions in a Planning Review report dated February 8, 2022, concluding that there was land use planning justification to raise concerns with the degree of conformity to the Town’s OP, and if not revised, an OP Amendment would be required concerning non-conformity to the Town’s Infill Development policies and the reclassification of the unopened road allowances to a local road classification.
58Mr. Russell was consistent in his opinion that an OPA was required to satisfy certain subsections of the Town’s OP and, in particular, to deal with the re-classification of unopened road allowances to local roads.
59Mr. Russell’s evidence was based on his opinion that the infill development should have larger lot sizes, larger frontages and consequently fewer lots. He submitted two alternate proposals for the plan of subdivision to support this.
60The Tribunal notes that the Town’s OP should be read as a whole, not just specific paragraphs. Section B3.1.5.1 of the Town’s OP states that, “although existing residential neighbourhoods are intended to retain their existing character with limited change, this does not mean that new housing must mimic the existing character and built form”.
61The Tribunal further notes that, if one were to accept the evidence of Mr. Russell, the proposed infill would not meet the objectives of the County OP and PPS with respect to efficient use of land.
62On the basis of the witness statements submitted and oral testimony presented by the land use planning experts, the Tribunal prefers the evidence of Ms. Loft and Mr. Taylor and finds that the proposal has regard for sections 34, 36 and 51(24) of the Planning Act.
Issue two: Does the proposed development conform with the County’s OP, sections 3.4.1, 3.4.1.1, 3.5, 4.2.5, 8.10, and 9.13?
63Ms. Loft explained that the subject lands are designated as “Primary Settlement Area” on Map 2A of the County’s OP.
64They are located where full municipal services can be provided. The proposal conforms to Section 3.3 Subsection 1) “Primary Settlement Areas” and Section 3.4 “General Policies Affecting Settlement Area Land Use Types” Subsection. 2) b) which ensures that new development does not conflict with the surrounding development.
65Ms. Loft also opined that the proposal conforms to Subsection 3) identifying that local Official Plans and plans of subdivision shall ensure a proper and orderly street pattern. The proposal conforms to Subsection 15) where the proposed development is compatible with adjacent land uses. The proposal achieves the Minimum Targets for Residential Intensification (Section 3.4.1),(Section 3.4.1 Subsection 1)).
66Ms. Loft submitted that the proposed development conforms to the “Primary Settlement Areas” policies within Section 3.5 including Subsections 2), 5) and 6), which she took the Tribunal to during her oral testimony.
67Mr. Taylor took the Tribunal to Sections 3.4.1 and 3.4.1 Subsection 1) of the County OP, which requires municipalities to promote intensification and redevelopment, while mitigating impacts on neighbouring residential areas. A mix of single detached and semi-detached dwellings does represent some additional density in this neighbourhood, but it is in accordance with the required residential density targets in Section 3.5 of the County OP. Semi-detached dwellings are generally considered to be compatible with the neighbouring single detached and condominium development in this area of Thornbury. Fencing and tree retention has been included in the Minutes of Settlement to assist in addressing the concerns of the neighbours.
68Mr. Taylor advised the Tribunal that Section 3.5 of the County OP provides policies for development of Primary Settlement Areas. Within “Primary Settlement Areas”, the County OP generally defers to the detailed policies and provisions in municipal Official Plans and Zoning By-laws. Section 3.5 Subsection 5) requires new residential development in Thornbury to meet a minimum residential density of 20 units per net hectare. This proposed plan of subdivision would achieve that density. Section 3.5 Subsection 6) again references the compatibility of intensification. Mr. Taylor stated that it is noteworthy that the County OP defines 'compatible' as follows:
"Compatible means the development or redevelopment of uses which may not necessarily be the same as or similar to the existing development but can coexist with the surrounding area with limited impacts.''
69This was confirmed in the written and oral testimony provided by Ms. Loft.
70During the County and Town’s Planning review, neither the County planning staff, nor the Town planning staff, have ever referred to the ‘must have’ Intensification Strategy required by the County’s OP.
71Ms. Loft advised that Accessory Apartments are permitted in each of the 20 units. These units would be located within Thornbury with appropriate levels of service. The four single detached units can have an Accessory Apartment in either the primary residence or within an accessory structure. It is anticipated that, with the depth of the lots, homeowners may wish to utilize these policies for Accessory Apartments within an accessory structure. The single detached units would allow for four accessory apartments. The semi-detached units are each permitted an Accessory Apartment which would permit up to 16 accessory apartments. It is anticipated that these units would be offered at market value by the homeowners and could also provide a homeowner with an opportunity to house an aging parent or family member. (Section 4.2)
72Ms. Loft also advised that the Accessory Apartments are expected to provide rental apartments which would have a range in size (bedrooms) and would provide a range of housing type in this area. (Section 4.2.1 and 4.2.2). The Accessory Apartments could be offered as rental units thereby increasing the number of rental units in the municipality by an upwards limit of 20 units. The site is suitable to accommodate rental housing and is within a central location and close proximity to services. The development is not by way of a condominium. (Section 4.2.2).
73Ms. Loft opined that the proposed Draft Plan conforms to the Plans of Subdivision and Condominium policies (Section 9.13) including Subsection 1) a) thru n) and Subsections 2, 3, 4, 5 and 6) which she took the Tribunal to in her oral testimony.
74Ms. Loft concluded by opining that the proposal conforms to the County’s OP.
75Mr. Russell, in his cross examination, agreed that the proposed development conformed with the County OP.
76However, he opined that the County OP directs municipalities to undertake a mandatory Intensification Strategy.
77Without the mandatory Intensification Strategy, he submitted that it was unknown whether the subject lands would qualify as lands for which higher density development would be appropriate and whether the subject lands should be directed to accommodate intensification development.
78The Tribunal notes that this Intensification Strategy is currently a work in progress, and as noted earlier in this decision, does not apply to this planning application.
79On the basis of the written and oral evidence provided by the expert witnesses, the Tribunal prefers the evidence provided by Ms. Loft and Mr. Taylor and finds that the proposal conforms to the County’s OP.
Issue Three: Does the proposed development conform with the Town’s OP?
80Ms. Loft advised the Tribunal that the subject lands are designated “Community Living Area” (“CLA”) within Schedule A-2 of the Town’s OP. Furthermore, the development has been considered “Intensification” within the policy framework.
81She explained that permitted uses in the CLA (Section B3.1.3) include single-detached dwellings, semidetached dwellings, duplex dwellings, local convenience uses, home occupations, residential intensification uses, nursing homes and senior citizen retirement homes. The proposed uses are permitted uses.
82She opined that the proposed residential use is contemplated in the Town’s OP and the use of the lands for the proposed density is appropriate for the area, given the location and surrounding area. The proposed development conforms to Section A2 by providing a land use form which provides a range of housing that is respectful of the character of the community and the established neighbourhood, while making efficient use of infrastructure.
83Ms. Loft further explained that the permitted density within the CLA is 10 to 25 units per gross hectare for singles and 15 to 35 units per gross hectare for semi detached. Based on a total of 20 lots, the development would have a density of 18.69 units per gross hectare and a density of 24.07 units per net hectare.
84Ms. Loft stated that the development would allow for accessory apartments in all units which could be provided for rent. The future owners of the dwellings could participate in housing programs that support appropriate housing development as it relates to either the primary dwelling unit or accessary apartment.
85Ms. Loft opined that the proposed building heights will reflect patterns of existing zoning provisions for height. As well, similar lot coverages to adjacent housing are based on the existing range of lot coverages in the area and the zoning provision requirements for the proposed zones. She opined that this is considered infill development, and, in her professional opinion, it complies with section B3.1.5.2 of the Town's OP.
86Mr. Russell, in his written and oral testimony, focussed on the mandated requirement for the Town to develop an Intensification Strategy report in order to comply with the County’s OP. In his opinion, the proposed development should be considered premature until such time as this plan has been conducted.
87Mr. Russell also expressed concerns that the proposed development was not compatible with the adjacent neighbourhood, in terms of lot size, building heights and setback requirements.
88Mr. Taylor submitted that County staff would generally defer to the planning opinion of Town staff with respect to Town OP conformity. County staff would also note that the Appellant's planner as well as planners for the Town and the Condo Corporation have also offered their assessment of Town OP conformity.
89Mr. Taylor did not agree with the HWRG opinion that a Town OPA may be needed based on the new streets serving this subdivision. Should that opinion be accepted, it could mean that all new subdivisions opening new streets or extending streets would require an OPA. County staff do not believe this was the intent of the Town OP, and certainly has not been interpreted in this manner in the past.
90The Tribunal notes that Town staff, in reaching a settlement agreement with the Appellant, are also of the opinion that the proposal conforms to the Town’s OP.
91Based on the evidence proffered by the expert witnesses, the Tribunal finds that an OPA is not required to deal with the matter of the unopened road allowances. The Tribunal prefers the evidence put forward by the Appellant, Town and County planners and finds that the proposed development is in conformity with the Town’s OP.
Issue Four: Is the proposed Zoning By-Law Amendment appropriate?
92Ms. Loft stated that the effect of the proposed Zoning By-law Amendment is to permit the development of the subject land for 20 residential units, including a mix of single detached units and semi-detached units, having frontage on an open and maintained municipal road.
93She provided the Tribunal with a detailed review of the proposed 20 lots, their frontages and lot areas.
94Ms. Loft also explained that there is a holding symbol included on all zones which provides that the condition of removal shall be the execution of a subdivision agreement with the Town, registration of a plan of subdivision and that municipal water and sanitary sewage capacity has been confirmed as available to service the development.
95She also explained that the current zoning includes a holding H3 symbol, which is proposed to be lifted upon the completion and acceptance of a D4 study.
96Mr. Russell advised the Tribunal that part of the west half of the subject lands are zoned holding H3, being in proximity to a former landfill site. He agreed that the Appellant had submitted a Ministry of the Environment D4 assessment dated November 2019 prepared by Peto MacCallum Ltd. and further peer reviewed on July 23, 2020, by Golder & Associates. Both reports concluded that there is no concern of significant adverse effects from the landfill on the proposed residential development at the site. The Tribunal notes that the issue of the D4 study has already been addressed by the other expert witnesses and considers this issue to be moot.
97Mr. Russell also expressed his concerns with respect to zone standards, and details regarding maximum lot coverage, lot widths, setbacks and building heights.
98Mr. Taylor was in agreement with the evidence provided by Ms. Loft. He opined that this matter had been discussed in the Planning Act review and County staff would generally defer to the planning opinion of Town staff.
99Mr. Taylor further opined that the proposed zoning amendment would appear appropriate in this regard.
100The Tribunal notes that the Town and County planning staff, in reviewing and approving the proposed development, have taken into consideration the required standards in the Zoning By-Law. Mr. Russell, in his opinion evidence, does not agree with the opinions expressed by the other experts.
101However, having considered the evidence presented by Ms. Loft and Mr. Taylor, the Tribunal prefers this over the opinion evidence of Mr. Russell.
102The Tribunal finds that the proposed Zoning By-Law Amendment is appropriate.
Issue Five: Is the proposed stormwater management approach appropriate for controlling water on-site and are there improvements needed in the off-site outlets to the Bay?
103Mr. Russell, in his witness statement, did not express a concern regarding stormwater management, he merely stated that, in order to conform to the Town’s OP, Section C5, the proposed design needs to be approved by the Town.
104Mr. Cooper, on behalf of the Appellant, provided the Tribunal with a detailed analysis of the stormwater management design undertaken for this development. He made reference to the Functional Servicing and Stormwater Management Report dated October 2019, which was reviewed and approved by Town and County staff.
105Mr. Taylor noted that there are recommended draft plan conditions which speak to finalization of a Stormwater Management Plan. Mr. Taylor further stated that the Grey Sauble Conservation Authority staff had not raised any stormwater concerns with respect to this development
106The Tribunal accepts the expert evidence provided by Mr. Cooper with respect to stormwater management.
Issue six: Does the proposed servicing meet Town Engineering Standards and is there water and wastewater capacity available?
107Mr. Russell opined that, in his professional opinion, until such time that Council is prepared to formally allocate both municipal water and sewer capacity to this project, a condition within the Holding provision of the Zoning By-law Amendment should be applied.
108Ms. Loft stated that the proposed development will be serviced with watermain and sanitary sewer via connections to the existing Municipal infrastructure adjacent to the site. The proposed internal servicing is in conformance with the Town’s Engineering Standards. Further details are provided in the 2019 Functional Servicing & Stormwater Management Report prepared by Crozier, which was reviewed by the Town and County.
109The Town’s annual water and wastewater capacity assessment was referenced in the 2019 Functional Servicing and Stormwater Management Report, which indicated that capacity was available for the number of units proposed. As is standard practice within the Town, confirmation of available capacity in the water and wastewater systems will be a condition of draft approval.
110Mr. Taylor explained to the Tribunal that the draft plan conditions and a holding symbol H41 are being applied to this development to ensure servicing capacity is in place prior to construction of the dwellings.
111The Tribunal accepts the evidence that the proposed servicing meets Town engineering standards, and that water and wastewater capacity will be available.
Issue seven: Is/does the proposed road design:
a. premature to approve until such time as final determination of the status of the portions of the unopened road allowance known as Bay Street West;
b. appropriate and represent good transportation planning;
c. consistent with Town Standards;
d. compatible with adjacent developments; and
e. accommodate for the movement of servicing vehicles?
112Mr. Russell opined that an OPA is required to be approved to reclassify the existing unopened road allowances road to a local road classification. His opinion was that additional mitigation design requirements would likely emerge from this public process.
113Mr. Russell concluded by stating that the final design of the proposed road is premature until the Town has approved the required OPA concerning reclassification of the road type.
114Mr. Fleming, on behalf of the Appellant, provided the Tribunal with a thorough and comprehensive review of the proposed road design, making reference to his Traffic Opinion letter. The road design extends the local road grid system, provides for active transportation with sidewalk that links to the external system and, in his professional opinion, will not cause traffic operations or safety concerns.
115Mr. Fleming also provided a critique of the two proposed draft plan concepts prepared by Mr. Russell, demonstrating how the road and cul-de-sac layout was sub-standard from a turning radius and intersection offset point of view.
116Mr. Fleming provided evidence that the proposed road design will facilitate the movement of waste collection vehicles, snow clearing and emergency vehicles.
117The Tribunal notes that a consistent theme throughout Mr. Russell's witness statement and oral testimony is the contention that the construction of a road in an unopened road allowance constitutes a change of road classification which would require an OPA. However, County and Town staff, through their approval, have made it quite clear that this is not required.
118Based on the expert evidence proffered by Mr. Fleming, the Tribunal finds that the proposed roadway design is appropriate and represents good transportation planning.
Issue eight: If it is determined that the proposed road network is appropriate, what is the appropriate terminus treatment at the Bay Street West and Victoria Street West intersection, and should implementation of this treatment be imposed as a condition of approval?
119Mr. Fleming explained that the Bay Street West and Victoria Street intersection will consist of two approaches, those being the south (Victoria Street) and the west (Bay Street West). There will be no east nor north approaches. As there are only two approaches to the intersection, the appropriate treatment would be a horizontal curve. Intersection controls such as stop or yield signs are not necessary as there are no conflicting traffic flows, such as a left turn across an oncoming lane. As a horizontal curve is the only viable treatment, it is not necessary for it to be imposed as a condition of approval.
120The Tribunal notes that, although this issue was added at the request of the HWRG, Mr. Russell had no comment on this matter except to confirm that the Official Plans promote grid pattern road design as the preferred road system.
Issue nine: Are the tree removal and retention on-site and in the abutting road allowances appropriate and in the public interest?
121Mr. Taylor submitted that having open and connected streets is in the public interest. While there will be limited tree retention available in the road allowances, a tree protection block is being proposed. Furthermore, Vegetation Assessments and Vegetation Management Plans are being required through draft plan conditions 24 and 25. The proposed Minutes of Settlement further states that:
“The Applicant agrees that any augmentation of the tree protection area in paragraph 6 above may be further identified in the Subdivision Agreement and shall be at the Applicant's cost"
122Ms. Loft explained that a Tree Preservation Block has been proposed within the unopened road allowance of Bay Street West. In order to achieve this, the proposed roadway has been pushed further south and appropriate land dedications have been provided in the Draft Plan of Subdivision.
123Based on the witness statements and oral testimony provided by the Appellant’s and the County’s witnesses, the Tribunal is satisfied that the proposed tree removal and tree retention on site and in the unopened road allowance is appropriate and in the public interest.
Issue ten: Does the current proposed 2.5 metre landscape buffer sufficiently mitigate undue impacts to neighbouring landowners? Are any alternative or additional buffering or conditions of draft plan approval required to ensure no light, noise and traffic impacts are suffered by adjacent landowners, including but not limited to, tree retention, fencing and setbacks?
124Ms. Loft explained that the 2.5 m landscape buffer previously contemplated has been revised and a tree preservation area varying between 0.0 and 9.0 m is proposed. The tree preservation area will begin approximately at the extension of Lot 6 and reach a maximum opposite the most easterly lot, Lot 20.
125Mr. Fleming opined that the proposed development will not result in light, noise and traffic impacts to adjacent landowners, and that a tree preservation area (or landscape buffer) is not required for the purposes of mitigation, notwithstanding it is being proposed for tree preservation purposes. The rationale for this opinion is as follows.
126The projected volumes of vehicle trips are low and are not associated with traffic operational issues at the boundary road network nor with the need for roadway network improvements. Accordingly, it is Mr. Fleming’s opinion that there will be no discernable traffic impacts to either adjacent landowners or the wider community.
127The reference to the 2.5 m landscape buffer refers to an older version of the proposed draft plan of subdivision. With the tree protection block now being proposed, it means that for some of the lots fronting onto Lakeshore Drive, there will be greater than 2.5 m of buffering. There is a privacy fence being proposed for the rear yards of 3 lots on Lakeshore Drive as well as abutting the rear yards of the Condominium Corporation.
128The proposed lots are quite deep with approximately 47 m of depth for the 3 single detached lots on Lansdowne Street North and 40 to 48 m of depth for the lots on the Bay Street West extension. This should provide adequate separation between the new single and semi-detached dwellings which would share a side yard or rear yard with those lots fronting onto Huron Street West.
Issue eleven: Does the proposed development contain sufficient details about the potential accessory units in order to determine the impacts on traffic safety and operations, and what mitigation measures are required to address any potential adverse transportation and parking impacts for neighbouring properties?
129Ms. Loft confirmed that any future Accessory Residential Units will be required to comply with Town zoning and engineering standards, as it applies to setbacks, parking, servicing connections, and entrances onto a Town street. While Accessory Residential Units would be permitted in each of the 20 residential units being proposed, County's staff's experience is that not all landowners will construct them. In more recent residential developments across the County, staff have not seen a huge uptake in Accessory Unit construction, and often less than 30% of the dwellings contain an Accessory Unit. County staff do not see the potential for Accessory Units to have any undue impacts on parking or traffic operations here. Particularly now that the streets are no longer proposed as one way streets, staff see little potential for heavy traffic volume impacts even if each of the 20 residential dwellings had an Accessory Unit.
130Mr. Fleming submitted that the vehicle trips generated from Accessory Units at some or all of the residential dwellings will be less than that forecast in the Traffic Opinion Letter for the residential units themselves. The maximum total volume of trips, if all of the residential dwellings incorporated accessory units would be 22 two-way a.m. trips and 30 two-way p.m. trips. This volume of trips is still considered low and would not result in discernable traffic impacts to either adjacent landowners or the wider community.
Issue twelve: What are the appropriate conditions to impose upon any approval of the proposed draft plan of subdivision, including any conditions and clearances regarding contamination, leachate or methane?
131This item has been discussed above, and there are no additional holding symbols needed as it pertains to the nearby former landfill site, and the former H3 holding symbol is proposed to be removed.
132The Tribunal notes that both the Town and County staff have agreed upon a settlement proposal with the Appellant, and there are conditions of draft plan approval to be satisfied by the Appellant prior to entering into final approvals being granted.
133On this basis, the Tribunal finds that there are no additional conditions that need to be imposed on the proposed draft plan of subdivision.
Analysis and Disposition of Issues List
134The majority of the three-day Hearing was taken up with evidence brought forward by the Appellant’s and County’s expert witnesses to address the twelve (12) issues on the Issues List, as requested by the HWRG.
135The Tribunal notes that the consistent theme throughout Mr. Russell's witness statement and oral testimony is the contention that the construction of a road in an unopened road allowance constitutes a change of road classification which would require an OPA.
136Mr. Russell also brought forward his opinion evidence that the proposed development was not compatible with the existing neighbourhood and, in the Tribunal’s opinion, he “cherry picked” certain clauses and sub-clauses in the Town’s OP and Zoning Standards to assist in supporting his submissions.
137The Tribunal finds that the oral testimony provided by Mr. Russell was not substantive and did not make a convincing argument as to why the proposed development should not be approved. Counsel for the Appellant made a point of stating that the HWRG concerns were, in essence, “much ado about nothing”.
138On the basis of the witness statements and oral testimony provided, the Tribunal concludes that the proposed development is consistent with provincial policies, conforms to the County’s OP, conforms to the Town’s OP, represents good planning and is in the public interest.
The Town’s requested condition that the Appellant provide six accessory apartments to be offered as affordable housing.
139With the exception of the HWRG, all Parties agreed that the proposed development had regard for matters of provincial interest, conformed to both the County and Town Official Plans, represented good planning and was in the public interest.
140The only contested issue between the Town and the Appellant was the recent request by Town Council for the Appellant to provide six accessory apartments to be offered as affordable housing.
141Both witnesses for the Town, Alar Soever and Robert Chapman, provided the Tribunal with PowerPoint presentations outlining the Town’s concern regarding the lack of affordable housing.
142Mr. Soever, the Town’s Mayor, told the Tribunal that the lack of affordable housing in The Blue Mountains is hampering the development of the community in that the lack of any affordable housing is making it impossible for essential workers to live in the Town. This includes, but is not limited to, police officers, volunteer firefighters, young doctors, personal support workers, early childhood educators, and other service industry workers.
143He provided the Tribunal with real estate sales data reports and statistics obtained from the Municipal Property Assessment Corporation.
144Mr. Soever also took the Tribunal to excerpts from the Planning Act, the PPS, the County OP and the Town’s OP where references have been made for the need to provide affordable housing in communities across Ontario.
145Mr. Sampson told the Tribunal that in January 2014, The Blue Mountains Attainable Housing Corporation (BMAHC) was established as a not-for-profit corporation with majority control held by The Town to augment the supply of healthy and sustainable ownership housing units in Town, with the goal of providing housing to moderate income working individuals and families locked out of the housing market.
146Under cross-examination, both witnesses confirmed that the Town does not have any formal policy in its OP to address affordable housing. The witnesses also confirmed that no staff report had been brought to Council’s attention regarding the provision of affordable housing, and in particular requesting affordable housing units in this subdivision.
147As noted by counsel representing the Town, this is an unprecedented request. The witnesses, under cross-examination, admitted that two previous subdivision applications had been approved by the Town without a request for the provision of affordable housing.
148Counsel for the Town submitted that there is a housing affordability crisis, not only in the Town, but across all municipalities in Ontario. He made reference to numerous excerpts from provincial policies requiring municipalities to provide for an appropriate range and mix of housing options to meet projected market-based and affordable housing needs of current and future residents.
149Counsel for the Appellant did not disagree there was an affordable housing crisis but questioned why this burden was being put upon his client by the Town, at the “eleventh hour” and with no statutory authority. He stated that this condition, if it were to be imposed, would equate to expropriation without compensation.
150Counsel brought forward the following case law for consideration by the Tribunal:
- Jock River Farms Ltd. v. Ottawa-Carleton (Regional Municipality), [1999]
- Taylor v. Guelph (City), [1998]
- Go-To Glendale Avenue Inc. v. St. Catherines (City), 2019
- Reemark Holdings No. 12 Inc. v. Burlington (City), [1991]
151The Tribunal notes that the “Go-To Glendale” case is very similar to the issue before the Tribunal, where a settlement was being proposed between the Appellant and the City, and a “last minute” ask for 10-30 % affordable housing units was injected by Council
152Mr. Treslan, on behalf of the County, also agreed that this was an unprecedented request.
153Counsel for the Appellant provided the Tribunal a copy of an email sent from Mr. Treslan’s office, as he was unable to attend closing arguments. The email was read into the record, as follows:
“Mr. Treslan, solicitor for the County of Grey, regrets that his trial is currently ongoing and that he is unable to make final submissions on the issue of the request by the Town for the condition relating to affordable housing. This is a request of concern to the County. Mr. Treslan has reviewed my submissions relating to that issue and adopts them as his own on behalf of the County. Absent inclusionary zoning powers or legal bonusing, the County submits that it has no legal authority to impose a condition requiring the dedication of affordable housing by a private developer in any manner (nor were they asked to in this instance). The County further submits that this Tribunal has no jurisdiction to impose such a condition. If such a condition were imposed, it would amount to expropriation without compensation.”
154The Tribunal recognizes that there is an affordable housing crisis across municipalities in Ontario. Earlier this year, the province released a report on the “Ontario Housing Affordability Task Force”.
155There is no question that municipalities must consider how best to accomplish the task of providing affordable housing. There are many tools available to assist in accomplishing this, such as Inclusionary Zoning, incentives and/or the use of Section 37 or Community Benefits provisions.
156However, the Town has not provided any tools by which the Tribunal can adjudicate on this matter. In the absence of OP policies providing direction, the Tribunal is not in a lawful position to grant or approve the Town’s request.
157Subsection 51(25) of the Planning Act states that:
“The approval authority may impose such conditions to the approval of a plan of subdivision as in the opinion of the approval authority are reasonable, having regard to the nature of the development proposed”
158Not only must the Tribunal consider the test of reasonableness, it must also consider whether the proposed condition is relevant, necessary and equitable.
159With respect to reasonableness, there is no policy basis for this request and the Town’s OP is silent, therefore the Tribunal does not consider this request reasonable.
160With respect to relevancy, the request is not tied to the development or the nature of the subdivision. Unlike servicing requirements which are clearly connected, the issue of affordable housing is a broader community issue and did not arise as a result of this proposal.
161With respect to equity, prior planning applications have not been asked to provide affordable housing, and yet this one developer is now being asked to set aside 6 units or 30% for affordable housing.
162The Tribunal finds that the Town’s request, although heartfelt and sincere, is not reasonable, is not relevant and is not equitable in the case of this proposed development.
Order
163The Tribunal Orders that the appeal is allowed, in part, and that the Zoning By-Law Amendment attached as Schedule 1 to this Decision, be approved.
164The Tribunal Orders that the appeal is allowed, in part, and that the Draft Plan of Subdivision and the Conditions of Draft Plan Approval, attached as Schedules 2 and Schedule 3 to this Decision are approved.
165The Tribunal Orders that pursuant to subsection 51(56.1) of the Planning Act, the County of Grey shall have the authority to clear the conditions of draft plan approval of the plan of subdivision for the purposes of subsection 51(58) of the Planning Act.
166The Tribunal will withhold its final Order respecting the above until such time that the Town of The Blue Mountains advises it has passed the Open Space Zoning By-Law Amendment for the depicted Tree Preservation Area in the portion of the unopened road allowance, and the time for initiating all appeals of the Open Space Zoning By-Law Amendment has expired.
167In the event that there are any difficulties implementing any of the conditions of draft plan approval, or if any changes are required to be made to the draft plan, the Tribunal may be spoken to.
168In the absence of Official Plan policy, the Tribunal encourages the Town of The Blue Mountains and Tammy Abbots to continue discussions towards a potential mutually agreeable resolution to the affordable housing concerns.
“T. Prevedel”
T. PREVEDEL
MEMBER
Ontario Land Tribunal
Website: olt.gov.on.ca Telephone: 416-212-6349 Toll Free: 1-866-448-2248
The Conservation Review Board, the Environmental Review Tribunal, the Local Planning Appeal Tribunal and the Mining and Lands Tribunal are amalgamated and continued as the Ontario Land Tribunal (“Tribunal”). Any reference to the preceding tribunals or the former Ontario Municipal Board is deemed to be a reference to the Tribunal.
Schedule 1
Zoning By-law Amendment
Schedule 2
Draft Plan of Subdivision
Schedule 3
Conditions of Draft Plan Approval