The appellant appealed the quality of construction of the Branconnier Drain, alleging defects including bank slumping, an obstructed culvert, lack of seeding, and unremoved sediment traps.
The Ontario Drainage Tribunal found that the bank slippage, culvert placement, and lack of seeding did not constitute construction defects, as they either complied with the engineer's report or were maintenance issues.
However, the Tribunal found a deficiency regarding the temporary sediment traps, which had not been removed as required by the specifications.
The Tribunal ordered the respondent municipality to complete the removal of the accumulated sediments and temporary sediment traps within six weeks.