The appellants appealed the engineer's report for the repair and improvement of the McClure Drain under the Drainage Act, challenging the watershed area, the Benefit/Outlet cost splits, the treatment of two culverts, and the allowances provided.
The Tribunal accepted the engineer's methodology for the cost splits and the watershed area, noting it was based on detailed field investigations.
However, the Tribunal agreed with the appellants that the easterly culvert should be classified as an erosion control feature and the westerly culvert as the primary access to the appellant's lands.
The Tribunal ordered the engineer's report to be revised to incorporate these culverts into the drain and adjust the Special Benefit assessment for the westerly culvert accordingly.
The appeal was granted in part.