The appellants appealed an Engineer's report for the Mullen Drain under the Drainage Act.
The Tribunal ordered modifications to the report, including centering the open drain on the property line, removing an earth berm and drop inlet structures, and placing excavated material on the Mullen property.
The Tribunal upheld the Engineer's methodology for the benefit and outlet liability assessments but ordered recalculations based on the modified works.