The plaintiff hospital brought an action against the defendant contractor for damages resulting from an over-humidification event that damaged operating room equipment.
The plaintiff alleged the defendant failed to properly install an air handling unit by omitting a required interlock between the supply fan and humidifier.
The defendant argued the damage was caused by hospital staff manually overriding the system.
The court found the defendant liable for breach of contract due to the installation deficiency and failure to train hospital staff, awarding the plaintiff full damages of $908,345.13.